Field glossary · measurement
Rack inlet temperature
Rack inlet temperature records the air reaching a particular server, so label the reading with the server identifier, probe position and time. ASHRAE's 2024 reference card gives H1 servers a recommended range of 18 to 22 C, compared with 18 to 27 C for A1 to A4. A ten-minute rise from 21 to 27 C also exceeds the card's 5 C excursion limit, even though both endpoints fit the A-class recommendation.
The air temperature entering the equipment, judged against the ASHRAE TC 9.9 allowable envelope through the ride-through
Locate the sensor relative to the equipment intake
Lawrence Berkeley National Laboratory's 2020 temperature-measurement report describes ASHRAE's equipment-verification sensor position as 2 inches in front of the equipment intake. Its practical alternative puts permanent sensors flush with the perforated front door. These positions answer slightly different questions when exhaust circulates inside the cabinet between the door and the server.
Name the point accordingly: cabinet-door air, server inlet or cooling-unit discharge. Keep a photograph of its location with the point record. When an internal inlet sensor and a door probe disagree, trace the air between them before applying a calibration offset. That comparison extends the inlet mapping in the in-row commissioning guide.
H1 servers have a narrower temperature window
ASHRAE published the revised and expanded fifth edition of Thermal Guidelines for Data Processing Environments in 2022; its reference card carries a 2024 copyright. That card gives H1 an allowable dry-bulb range of 15 to 25 C at elevations up to 900 m.
ASHRAE assigns the decision to use H1 to the equipment manufacturer. A high rack power reading alone does not establish the class. Carry the server model's environmental specification into the thermal-envelope record so the alarm limit follows the installed equipment.
ASHRAE derates H1's maximum allowable temperature by 1 C for each 500 m above 900 m elevation. At 1,900 m, the upper limit becomes 23 C, so a 24 C inlet exceeds it despite falling below the unadjusted 25 C maximum.
Check temperature excursions as well as the peak
For non-tape IT equipment, ASHRAE's 2024 revised fifth-edition reference card limits inlet temperature change to 5 C within any 15-minute period and 20 C within an hour. These are maximum-minus-minimum excursions within the stated windows, rather than a slope calculated between successive samples.
An A-class inlet rising from 21 C to 27 C in ten minutes has a 6 C excursion. Its endpoints fit the usual recommended dry-bulb band, but the excursion exceeds the 15-minute criterion. A later return to 21 C does not erase that event. Preserve the time series and rolling extrema in the integrated systems test record.
Distinctions
- Processor temperature
- A processor sensor measures a component heated by its workload. Its alarm threshold and thermal margin cannot be substituted for an inlet-air limit.
- Rack exhaust temperature
- Exhaust includes the temperature rise through the equipment. Pair it with the corresponding inlet when calculating the rack's air-side delta-T.
Frequently asked questions
Does staying in the allowable range guarantee full server performance?
ASHRAE describes the allowable range as a functionality envelope and notes that power or thermal management can activate within it. Record throttling and fan behavior separately from the inlet-temperature pass result.
Can a sensor at the cabinet door miss an internal hot spot?
Yes. Berkeley Lab identifies internal rack recirculation as a reason cabinet-face and actual equipment-inlet readings differ. Compare the suspect server's intake with its door sensor under the same workload.
Sources checked
- ASHRAE TC 9.9: Thermal Guidelines, fifth edition revised and expanded (2022), reference card copyright 2024
- ASHRAE: Fifth-edition errata (May 31, 2022), publication date of the revised and expanded edition
- Lawrence Berkeley National Laboratory: Thermal Guidelines and Temperature Measurements in Data Centers (2020), sections 6 and 7
Also defined as
- The air temperature at the server intake, the number judged against the ASHRAE TC 9.9 envelope, not the room average