Field glossary · safety
Slope ratio (H:V)
A 3H:1V slope uses 18 ft of horizontal run for a 6 ft rise, producing a 33.3 percent grade and about 18.4 degrees from horizontal. That notation describes footprint, not soil stability. Under OSHA Appendix B, ordinary simple slopes up to 20 ft deep use maximum inclines of 0.75H:1V for Type A, 1H:1V for Type B and 1.5H:1V for Type C, subject to the specified site conditions.
Horizontal run to vertical rise of a cut wall; a flatter number is a wider, safer cut
Turn the ratio into footprint and surface area
For a 3H:1V slope, a 6 ft vertical change requires 18 ft of horizontal run. The slope is 33.3 percent because percent grade is 100 × V/H; its angle from horizontal is about 18.4 degrees. A 3:1 ratio therefore does not mean a 3 percent grade.
The face length is the square root of run squared plus rise squared. That 18 ft run and 6 ft rise produce about 18.97 ft of sloping face. Over 100 ft of level contour length, the face covers about 1,897 square feet. Use slope area for erosion blankets or seed coverage when the specification measures the actual surface.
Excavation footprint includes both sides. A simple 10 ft deep trench with a 4 ft bottom and 1.5H:1V sides has a top width of 4 + 15 + 15, or 34 ft. Spoil setbacks and equipment access require additional space beyond that geometric width.
Use the ordinary soil limits before the short-term exception
OSHA Appendix B's ordinary simple-slope configurations through 20 ft depth use 0.75 ft, 1 ft and 1.5 ft of run per foot of depth for Type A, B and C soil respectively. At 10 ft depth with a 4 ft bottom, those ratios require top widths of 19, 24 and 34 ft. This translates the soil selection into the actual excavation footprint.
The Appendix B configurations for excavations deeper than 20 ft require design by a registered professional engineer. The maximum inclines also assume favorable conditions; surcharge, distress and layered ground can demand a flatter face or a different protective system.
A short-term exception has two limits
OSHA Subpart P, Appendix B permits a 0.5H:1V simple slope in Type A soil only when the excavation is no deeper than 12 ft and remains open no longer than 24 hours. The exception does not authorize a steeper cut merely because the crew plans to finish quickly.
OSHA Appendix A requires soil classification to use at least one visual and one manual analysis by a competent person. It also excludes fissured soil and soil subject to vibration from Type A. A strength result alone does not erase those disqualifying conditions.
Keep the classification and exposure assumptions beside the slope ratio in the excavation protective-system plan, so a changed condition is visible as a design change.
Distress requires a flatter actual slope
OSHA 29 CFR 1926.651(k)(2) requires exposed employees to leave the hazardous area when the competent person identifies a possible cave-in or protective-system failure, until protective precautions are in place. Finding distress therefore changes site access immediately; cutting back the face is the subsequent corrective work.
OSHA Appendix B requires a slope showing distress to be cut back at least an additional 0.5H:1V from the maximum allowable slope. Starting from a 1.5H:1V maximum, that means 2H:1V or flatter, not simply smoothing the existing face.
For a 10 ft depth, the change adds 5 ft of horizontal run on each affected side. That space must exist on the site; a fence or live traffic lane does not change the geometry. Surcharge from stored material or operating equipment also enters the competent person's slope assessment under Appendix B.
In landscape work, distinguish the proposed finished slope from the excavation slope during construction. The same H:V notation can label both while the materials, loading and acceptance requirements are different.
Distinctions
- Percent grade
- Percent grade is 100 × V/H. With the ratio normalized to H:1, divide 100 by H; 3H:1V is 33.3 percent, not the unscaled reciprocal 0.333 percent.
- Angle from horizontal
- Calculated as arctan(V/H), so a larger H:V ratio corresponds to a smaller angle.
Frequently asked questions
Does 1:2 mean the same thing as 2:1?
No. With H:V explicitly stated, 1:2 is steep and 2:1 is flatter. Label the axes rather than relying on a bare pair of numbers.