TES

TES, or thermal energy storage, holds heating or cooling for later use and needs two ratings: kWh thermal for stored energy and kW thermal for delivery rate. Data-center drawings often mean chilled-water or ice storage; the broader term also covers hot-water storage. A 750 kWh thermal store covers 30 minutes at 1.5 MW thermal only if its discharge circuit can deliver that output. Tank volume alone does not establish either rating.

Thermal energy storage, a chilled water or ice tank that holds the cooling loop through the chiller restart

Used across 2 Anvilfield field guides, most in Datacenter.
Updated

Stored cooling and cooling output are separate ratings

The U.S. Department of Energy's 2020 Thermal Energy Storage fact sheet groups TES into sensible, latent and thermochemical storage. Chilled water belongs to sensible storage, while ice uses a phase change. The acronym identifies the broader storage function; it does not specify a vessel construction or hydraulic connection.

A system holding 750 kWh of usable thermal energy supports a 1.5 MW cooling demand for 0.5 hour, or 30 minutes, if its discharge equipment can deliver 1.5 MW. A heat exchanger limited to 1.0 MW leaves a 0.5 MW shortfall from the start despite the stored energy. State energy in kWh thermal and output in kW thermal so the two limits remain distinct. The chilled-water storage guide develops tank sizing and stratification.

Which water moves in an ice-storage system?

CALMAC states that the water inside its IceBank tanks remains in the tanks; a secondary heat-transfer fluid circulates through the internal coils. That arrangement differs from withdrawing the stored cold water itself. A tank water-level observation and a secondary-loop flow measurement therefore describe different parts of the installation.

CALMAC specifies minimum concentrations of 25% ethylene glycol or 29% propylene glycol for its internal-melt ice-on-coil technology. These manufacturer limits belong to that ice-making circuit, not to every chilled-water loop. The manufacturer's concentration basis and approved fluid determine the corresponding fill specification. A separating heat exchanger keeps the storage-side fluid requirement distinct from the building distribution loop.

Recharge time determines readiness for the next event

CALMAC reports a usual ice-making recharge period of eight to ten hours for its applications. A discharge-duration rating therefore does not establish how quickly the storage is ready again. The charging equipment must remove the discharged energy while also serving any cooling load assigned to it during charging.

Replacing 750 kWh thermal with 250 kW of net charging capacity takes three hours before storage losses and any changing charge-rate limits. If only 125 kW remains after the ongoing building demand, the same energy replacement takes six hours. Include available charging capacity and the recharge window in the operating schedule, then retain the storage state at the start of the integrated systems test.

Distinctions

Internal-melt versus external-melt ice storage
DOE's TES fact sheet distinguishes an internal-melt coil carrying secondary coolant from an external-melt arrangement in which return water contacts the stored ice. CALMAC's static tank-water description applies to its internal-melt product; it does not describe every ice-storage hydraulic circuit.
Electrical battery storage
An electrical battery returns electrical energy through its power-conversion system. TES delivers heating or cooling; pumps, controls and fans still require their assigned electrical supplies.

Outdoor storage-tank service territories start with visible equipment: PorchRocket Asset Search returns reviewed tank locations and the owner of record for each find.

Frequently asked questions

Does a TES kWh rating describe electricity saved?

A kWh thermal rating describes stored heating or cooling. Converting it into electrical consumption requires the charging plant's efficiency and auxiliary energy. Moving a cooling load between hours is different from reducing total electricity use.

Sources checked

Also defined as

  • Thermal energy storage, here a chilled water tank that banks cooling capacity

Where this shows up