Field glossary · measurement
Yield
A well-yield result states the discharge in gallons per minute, how long it was sustained and where the water stood relative to the pump intake. Falling water levels mean some discharge came from borehole storage, so a flowmeter reading alone does not establish the aquifer's contribution. Concrete batch yield measures fresh volume in cubic yards or cubic meters, calculated from material weight and measured density.
The gpm the well sustains over time, the ceiling on pump sizing
Checking the discharge measurement
USGS Scientific Investigations Report 2010-5212 checks flowmeters against timed collection in a known-volume container. Capturing 5.0 gallons in 120 seconds gives 5.0 x 60 / 120 = 2.5 gpm. Pair each discharge reading with elapsed time and water level during pumping; continue time-stamped water-level readings during recovery. Keep that measurement series with the well pump and pressure tank record.
How long should a well-yield test run?
Washington's WAC 173-160-321(2) requires at least one hour of constant-rate testing for wells that do not require an appropriation permit, extended when required by the state Department of Health. Under subsection (1), permitted wells are tested at or above the expected normal-use rate, and yield and drawdown are determined after at least four hours of constant-rate pumping. Public-supply testing continues longer when the Department of Health requires it. Bailer testing is barred for permitted wells and public supplies; subsection (2) allows a bailer, air lift or pump for wells not requiring that permit.
USGS Scientific Investigations Report 2010-5212 found that extending pumping from 60 to 180 minutes reduced specific capacity by as much as 62% in tests of low-yielding Pennsylvania fractured-bedrock wells. The same study found repeat results generally within about 20% when pumping rate and duration matched. Compare tests at matching rates and durations, with the initial water level and productive fracture depths recorded alongside them.
Why pump discharge can exceed aquifer inflow
Penn State Extension gives 147 gallons of borehole storage for a 6-inch-diameter well containing a 100-foot water column, equivalent to about 1.47 gallons per vertical foot. Lowering that column supplies part of the measured discharge. A steady flowmeter reading with a steadily falling water level therefore combines aquifer inflow and depletion of stored water.
In USGS's March 2008 test of well WS 155, pumping was 2.5 gpm and the water-level decline from 140 to 180 minutes was 0.16 ft/min, using a 6-inch bore diameter. Storage supplied about 0.24 gpm: 1.47 x 0.16. Subtracting this from discharge gives approximately 2.3 gpm of aquifer inflow during that interval. The storage correction depends on the bore diameter across the falling water column; an enlarged open hole stores more water per foot.
When does a well need rehabilitation?
Penn State Extension's well-rehabilitation guidance identifies a yield decrease of 25% or more as a trigger for rehabilitation. A decline from 8 gpm to 6 gpm reaches that threshold: (8 - 6) / 8 x 100 = 25%. Establish the change with comparable tests and retain the original completion and pumping records.
Penn State lists mineral incrustation, biological fouling, sediment plugging, screen or casing corrosion and pump damage as causes of falling production, while drought can lower the source water level. Compare water-level history, pump output and screen or open-hole condition to distinguish source decline from pump faults or well deterioration.
How is concrete batch yield calculated?
ASTM C138/C138M-24a (2024), active as of November 5, 2026, covers fresh-concrete density and yield calculations. NRMCA's 2016 CIP 8 uses the average density of representative samples from three separate delivery loads to calculate each batch's volume.
NRMCA's field checks include an accurate, level scale, a verified measure volume, flat-plate strike-off and a clean measure exterior. Density is the net concrete weight divided by the measure volume, excluding the empty measure's weight.
In CIP 8's 8-cubic-yard example, 32,220 lb of batched materials divided by (151.0 lb/ft3 x 27) yields 7.90 cubic yards. The 27 converts cubic feet to cubic yards. Compare measured fresh volume with ordered volume; additional placement consumption needs a separate accounting of returns, waste and actual geometry. The laser screed guide covers base-grade checks; batch weights and density supply the delivery evidence.
Distinctions
- Specific yield
- USGS defines specific yield as the fraction of saturated rock volume released as water by gravity drainage. It describes aquifer storage and is dimensionless; a well's yield is a flow rate.
Frequently asked questions
Can specific capacity predict the maximum well yield?
USGS Report 2010-5212 shows the error at well WS 155: storage-adjusted specific capacity of about 0.13 gpm per foot multiplied by 95 ft of available drawdown suggests roughly 12 gpm, against late-test inflow of about 2.3 gpm. That extrapolation assumes aquifer contribution stays proportional to drawdown. Once shallow productive fractures are dewatered, additional lowering can drain borehole storage without a proportional gain in aquifer inflow.
Is coating yield measured the same way as concrete yield?
Coating yield expresses area covered per unit of material at a stated film thickness. Concrete batch yield expresses fresh volume produced from the batched materials. The roof coating thickness and yield guide connects coating coverage to the specified film, volume solids and field losses.
Sources checked
- Washington State Legislature: WAC 173-160-321, well testing; current text, amendment effective December 22, 2006
- USGS: Risser, Scientific Investigations Report 2010-5212; discharge measurement, page 6; test comparisons and WS 155 yield estimates, pages 39 and 40
- Penn State Extension: Using Low-Yielding Wells, updated September 8, 2025; borehole storage
- Penn State Extension: Water Well Maintenance and Rehabilitation, updated May 29, 2025; yield-loss threshold and causes
- ASTM International: C138/C138M-24a (2024), active density and yield test method
- NRMCA: CIP 8, Discrepancies in Yield, 2016 revision; sampling, batch calculation and placement reconciliation
- USGS: Water Resources Glossaries, specific-yield definition
Also defined as
- Concrete: Concrete volume actually used; a high or wavy base raises it by thickening the lows