FieldOS for Electrical
The field CRM for Electrical crews.
Run electrical jobs from the first visit to getting paid: capture the work in the field, build photo and checklist proof, send the customer a clean record, and run the operation offline. Built on the Anvilfield system, with every free electrical calculator, checklist, and guide feeding in.
Works offline. Built for the truck, the roof, and the basement, not just the office.
How it works
One flow, from the electrical field to getting paid.
Capture the electrical job in the field
Log the visit, the customer, the scope, and the readings once. No clipboard, no re-typing it at the truck.
Build the proof as you work
Before-and-after photos, checklists, and sign-offs attach to the job automatically and stay organized by stop.
Send a clean record
One link sends the customer a branded proof page with the photos and the work done, so they see a professional record.
Run the whole operation
Jobs, estimates, change orders, and customer history in one place, offline, syncing when you get signal.
Start free
The free electrical tools that feed FieldOS.
Every Anvilfield electrical calculator, readiness check, and field guide is free and works offline. Run them today; capture the job and the proof in FieldOS when you are ready.
Offline electrical field apps
Run your next electrical job through FieldOS.
Open it in your browser or on the app and capture your next visit, nothing to install to try it. The customer gets a clean, branded proof record: the before-and-after photos, the completed checklist, the work done, and the sign-off, in one link.