ANVILFIELD Try FieldOS

FIELD GUIDES

Practical answers for field work

Direct answers, calculators, checklists, code notes, and inspection packets. Built from real jobsite questions and workflows.

Latest guides

All TypesAll TradesNewest
Field GuideWater damage mitigation and structural drying field guideStop the source, determine the water category, extract standing water, and dry retained materials to documented goals based on unaffected materials. Record daily progress and completion for the claim file.Water MitigationIICRC S500Structural Drying 21 min read Field GuideConcrete slab moisture testing for flooring field guideMeasure how wet the slab is before flooring goes down, test deep with the RH probe, condition the building first, and meet the flooring manufacturer's number or mitigate.Slab Moisture TestingASTM F2170ASTM F1869 21 min read Field GuideRoof storm and hail damage assessment and insurance restoration field guideHow a roofer reads real hail and wind damage, documents the storm claim, and works it ethically and legally: ACV vs RCV, the deductible, supplements, and staying out of public adjusting.Storm RestorationHail DamageInsurance Claim 21 min read Field GuideCommercial roof asset management and capital planning field guideHow an owner runs a portfolio of roofs as a capital asset: the inventory, the condition rating and remaining life, the repair-restore-replace decision, and a multi-year capital plan that prioritizes the spend.Roof Asset ManagementCapital PlanningRoof Condition Index 30 min read Field GuideParking structure restoration and repair field guideWhy a garage is concrete under constant chloride attack, and the program that stops the corrosion before it patches the spalls: condition survey, repair behind the bar, anodes, and waterproofing.Parking Structure RestorationChloride CorrosionCathodic Protection 21 min read Field GuideData center TCO and the cost model field guideWhat a data center costs over its life, how facility and IT ownership change the total, and how to model electricity, capital and operating costs for build, colocation and cloud.Data Center TCOCost Per MWCapex and Opex 21 min read Field GuideBuilding expansion and movement joint systems field guideWhat a building movement joint is, why a building that cannot move cracks itself apart, the joint family, how to size it, and how to run it continuously through every layer and keep it dry.Movement JointsExpansion JointSeismic Joint 21 min read Field GuideWater heater maintenance field guide: anode rod, flushing, and the T&PMaintain the anode, remove sediment, and test the relief valve on the schedule specified for the installed heater.Water Heater MaintenanceAnode RodSediment Flush 21 min read
View electrical guides

Free field tools

All field tools
Direct answers to real jobsite questions Checklists and packets that stand up to review Code notes without the fluff Connected to the right tools for the job