Field glossary · equipment
Sewage ejector
A sewage ejector lifts raw wastewater to a higher drain; Zoeller's 1/2 hp Model 267 passes a 2-inch spherical solid and delivers 85 gpm at 10 ft of total dynamic head. At 15 ft, that same pump delivers 45 gpm, a capacity drop of about 47%. Specify a replacement by its solids passage, flow at the installed head, wastewater-temperature limit and control arrangement. Matching horsepower alone misses those differences.
A solids-passing sewage pump, distinct from a grinder that cuts solids and an effluent pump that handles low-solids liquid
The basin vent and pump air-relief hole do different work
The basin vent exchanges air above the wastewater; an air-relief opening releases air trapped in the pump's hydraulic passage. A clear basin vent does not establish that the pump casing is free of trapped air. The ejector installation guide covers the basin and building vent connections.
For a Model 267 with a Unicheck, Zoeller's July 2026 FM2676 instructions specify a 3/16-inch discharge-pipe relief hole level with the pump top, below the check valve and basin cover. The manual identifies a visible stream from that opening during operation as expected behavior.
Liberty Pumps' LE/LEH manual 7034000N states that some models have a built-in air-bleed hole and that a small spray during operation is normal. Identify the installed model's relief arrangement before treating that spray as a failed seal. The same manual requires disconnecting pump power before handling equipment or making adjustments.
Compare ejectors with the same horsepower
Zoeller's June 2026 Model 267 data sheet and Liberty Pumps' 2026 LE50 data sheet describe 1/2 hp pumps with 2-inch spherical-solids passage. Their published 60 Hz ratings show why the horsepower and solids diameter do not complete a replacement specification.
A spherical-solids rating describes passage size, not resistance to every flexible object in wastewater. Liberty Pumps' LE/LEH instructions exclude wipes, towels, dental floss and other consumer items besides toilet paper from non-grinder systems. A cloth strip can wrap or bridge even when its thickness is well below the stated passage diameter.
Liberty Pumps' LE50 data sheet separates its 104°F continuous-duty limit from its 140°F intermittent limit. Record the incoming temperature and duration when laundry or process discharges enter the basin. Zoeller lists 130°F as the Model 267 maximum operating temperature without the LE50 sheet's continuous/intermittent split.
| Published rating | Zoeller Model 267 | Liberty LE50-Series |
|---|---|---|
| Motor output | 1/2 hp | 1/2 hp |
| Spherical-solids passage | 2 inches | 2 inches |
| Flow at 10 ft total dynamic head | 85 gpm | 118 gpm |
| Maximum liquid temperature | 130°F | 104°F continuous; 140°F intermittent |
Quantify lost capacity before condemning the motor
Zoeller publishes 85 gpm at 10 ft of total dynamic head and 45 gpm at 15 ft for the Model 267. At a steady 30 gpm inflow, those pumping rates leave 55 gpm or 15 gpm of net drawdown capacity. Emptying 20 gallons of working volume takes about 22 seconds at the first rate and 80 seconds at the second. Use the measured flow on the product's pump curve to explain longer cycles when discharge conditions change.
Liberty's LE/LEH troubleshooting chart names a missing or faulty curb-stop/swing-check assembly when sewer-system pressure feeds back through the discharge. Its pressure-sewer instructions locate that assembly near the public right-of-way. Distinguish it from the check valve at the pump discharge that retains the riser column; identifying the wrong valve sends the repair to the wrong location.
A downstream surcharge changes the discharge boundary used in the head calculation. Capture the receiving water level during the complaint, rather than relying on a pipe elevation measured when the sewer was empty. Use the backwater protection guide to document the separate reverse-flow protection.
Zoeller inspection and service intervals
Zoeller's FM2676 instructions, July 2026 revision, call for system inspection and operational testing at least every three months. Put the next due date on the service record rather than leaving the interval as periodic maintenance.
Zoeller's FM2676 service checklist requires disconnecting pump power and allowing 2-1/2 hours before attempting service because the pump's oil can be hot and pressurized.
Keep the manual revision, relief-opening location, liquid-temperature limit and pump model with the findings. These details explain why a repeat visit needs a different repair when the motor still runs but air binding, hot wastewater or return flow persists.
Distinctions
- Replacement pump versus packaged ejector system
- A bare pump specification does not describe basin working volume, cover penetrations, control arrangement or alarm equipment. Identify which parts of the assembly are included when comparing replacements.
Frequently asked questions
Why does the ejector run again after cooling down?
Zoeller lists automatic-reset thermal overload protection on single-phase Model 267 motors. Restart after cooling fits that protection behavior; the service finding is the overheating cause, not proof that the fault has cleared.
Should I add oil to a sewage ejector motor?
Liberty's LE/LEH maintenance instructions specify an oil-filled motor requiring no added lubrication. Opening a sealed motor is not a routine oil-change task; follow the model's service instructions for a seal or motor repair.
Sources checked
- Zoeller: FM2676 installation instructions, July 2026, air relief, three-month testing interval and 2-1/2-hour service cooling period
- Zoeller: Model 267 technical data FM2789, June 2026, flow/head table, temperature and motor protection
- Liberty Pumps: LE and LEH installation manual 7034000N, 2022, air bleed, prohibited waste, maintenance and troubleshooting
- Liberty Pumps: LE50-Series data sheet, 2026, continuous and intermittent liquid-temperature ratings
Also defined as
- A pump that lifts below-grade fixture waste up to the gravity drain, separate from backup protection