Field glossary · property
Soil resistivity
Soil resistivity is the material input to an earth-current model, obtained in a four-probe survey by applying the array's geometry factor to measured resistance. With AEMC's shallow-probe Wenner formula, 4 m adjacent spacing and 8 ohms give an apparent resistivity of 201 ohm-m, or 20,100 ohm-cm. This represents the ground volume sampled by the probes, not the resistivity of a single layer 4 m deep. Installed-electrode resistance is a separate result in ohms.
A property of the soil itself, in ohm-meters or ohm-centimeters; the input that drives ground resistance
What apparent resistivity says about soil layers
EPA describes a resistivity reading as a weighted response from a volume of ground, with material near the electrodes contributing more strongly. For uniform ground, EPA gives a Wenner depth of investigation of about 30 percent of the current-electrode separation. A 12 m outer-probe span therefore corresponds to roughly 3.6 m, not a thin layer measured at the 4 m adjacent spacing. Increasing spacing changes the survey's depth sensitivity.
IEEE 81-2025, published July 15, 2026, is the current IEEE guide for earth-resistivity and grounding-system measurements. Preserve the measured spacing series alongside the interpreted layer thicknesses and resistivities. A ground-ring design needs the model as well as the field observations described in the soil testing guide; a list of instrument readings is not itself a layer model.
Probe depth and spacing errors in a Wenner test
AEMC's Model 6471 manual requires Wenner probes to be driven less than one-twentieth of the adjacent probe spacing. At 4 m spacing, that means less than 0.20 m penetration. The manual's automatic resistivity calculation accepts spacings from 2 to 300 m; longer spacings require manual calculation. These are instrument instructions, including a geometric condition, rather than a soil classification rule.
With adjacent spacing a = 4 m and measured resistance R = 8 ohms, AEMC's Wenner formula gives apparent resistivity 2 x pi x 4 x 8 = 201 ohm-m. The outer probes are 12 m apart. Entering that total span as a would report 603 ohm-m, a threefold error from the same resistance reading. Write adjacent spacing and total array length in separate fields.
Useful ranges without guessing the soil type
EPA's Electrical Methods reference gives typical resistivity ranges of 1 to 20 ohm-m for clay and 20 to 200 ohm-m for wet-to-moist sand. It lists shale at 1 to 500 ohm-m. Their overlap explains why a resistance survey alone cannot identify a soil by name. Pore-water chemistry, water content, mineral composition, and porosity change the electrical response.
Use those ranges to question a misplaced decimal or a unit conversion, then use the site measurements for design. At 201 ohm-m, the example above is 20,100 ohm-cm. Comparing the first number directly with an ohm-centimeter corrosion report would understate it by a factor of 100.
Field survey versus soil-box corrosion results
ASTM G57-20 covers Wenner measurements in place and on removed soil samples, with results reported in ohm-centimeters. ASTM G187-23 covers a two-electrode soil box and includes both as-received and saturated sample conditions. A sample result therefore needs its moisture condition and test method attached before it is compared with an in-place survey.
ASTM G187-23 states that a saturated soil-box result does not necessarily represent the soil's minimum resistivity. Preserve the measured condition rather than relabeling a saturated result as the lowest possible value. This matters for cathodic protection, where the corrosion interpretation and the groundbed design both use soil data but ask different questions.
Distinctions
- Ground resistance
- In the Wenner example, 8 ohms becomes 201 ohm-m only after the probe geometry enters the calculation. Keep an electrode's fall-of-potential result in a separate report field; neither of those survey numbers is automatically the installed electrode's resistance.
- Electrical conductivity
- Conductivity is the reciprocal of resistivity when compatible units and measurement conditions are used. A reported conductivity needs its units and sample conditions just as a resistivity value does.
Frequently asked questions
Does a low soil resistivity prove a safe ground grid?
No. IEEE 81-2025 treats ground impedance, touch and step voltages, and grounding-system integrity as separate measurement topics. A soil-model value does not supply those results in the ground resistance and bonding test record.
Can a saturated laboratory sample replace the field survey?
The sample describes the collected material in a stated condition. The field survey includes the arrangement of materials across the site. Retain both results with their methods instead of averaging them into one soil value.
Sources checked
- US EPA: Electrical Resistivity, apparent resistivity, uniform-ground depth of investigation, and inverse modeling
- AEMC Model 6471 user manual, sections 3.2.6 and 5.6.4: Wenner geometry and calculation
- US EPA: Electrical Methods, typical earth-material resistivities
- ASTM G57-20: active Wenner four-electrode test method, public scope
- ASTM G187-23: active two-electrode soil-box method, public scope and significance
- IEEE 81-2025: active grounding measurement guide, published July 15, 2026, publisher scope
Also defined as
- Datacenter: The soil's own resistance property, in ohm-meters or ohm-centimeters
- How strongly the earth resists current, measured by the Wenner four-point test, set in ohm-meters