Field glossary · component
Signal reference grid
A signal reference grid (SRG) is the room's interconnected reference mesh, specified by geometry, material and equipment bonds. For example, nVent supplies a 2-foot mesh as flat copper strip, while a loose-wire grid needs individual runs and crossing connections. Those arrangements need different takeoffs and inspection records. APC's White Paper 87 distinguishes ground-referenced copper interfaces from Ethernet and fiber, so identify the interfaces behind the mesh requirement.
A bonded conductor network providing reference connections for electronic equipment
Identify the copper form before counting material
nVent ERICO's datacom grounding catalog describes SRGBD100 as a preformed grid of 2-inch-wide, 26-gauge copper strip on 2-by-2-foot spacing, supplied in a 10-by-100-foot roll. That product is not a spool of round grounding wire. Its width, intersections and roll boundaries determine how it fits the room.
The same catalog identifies separate mesh-bonding connectors by conductor range: MBNC82 accepts #8 through #2 AWG solid or stranded wire, while MBNC240 accepts #2 through 4/0 AWG stranded wire. A connector selected for a wire mesh is not automatically the specified connection for a flat-strip grid. Match the actual grid construction and pedestal interface on the submittal.
A 20-by-30-foot wire layout contains 650 feet before allowances
For a rectangular wire grid at 2-foot spacing, including all perimeter lines, a 20-foot width needs 11 runs extending the 30-foot length. The 30-foot length needs 16 cross-runs extending the 20-foot width. The base conductor quantity is therefore 11 x 30 + 16 x 20 = 650 feet, with 11 x 16 = 176 geometric crossings.
Count the 176 crossings as geometric locations before choosing connectors. Equipment tails, cutouts, perimeter terminations and bonded pedestal interfaces each need their own quantities. For a preformed strip grid, instead draw roll coverage and the joints between rolls. Include both arrangements in the raised-floor acceptance record while the interfaces remain visible.
Tie the grid to the interface it is meant to protect
APC's White Paper 87, revision 2006-0, identifies the SRG's specific purpose as reducing noise voltage on ground-referenced copper communication channels. Its discussion distinguishes those interfaces from balanced Ethernet and fiber connections. A room containing network racks does not, by that fact alone, explain the technical need for a particular SRG.
TIA's May 2024 announcement identifies ANSI/TIA-607-E as the standard for generic telecommunications bonding and grounding infrastructure and its interconnection with electrical and telecommunications systems. Keep that broader infrastructure requirement distinct from the choice of a particular mesh product.
Map each equipment reference point to its strip or conductor connection on the room drawing. That schedule supplies physical inspection locations for the broader data-center grounding design, including roll joints and connections hidden by replaced tiles.
Distinctions
- Rack baying versus electrical bonding
- APC's White Paper 87 warns that rack baying kits commonly leave paint or plating between joined surfaces. Mechanical attachment therefore needs a separate review of the intended electrical bond and its connections.
Sources checked
Also defined as
- Datacenter: A bonded conductor grid tying the floor and equipment to a common reference potential