Concentrated (point) load

A concentrated load is force delivered through a small contact area, such as a cabinet foot or caster. An access-floor concentrated-load rating is a tested limit for that localized force, under specified supports and acceptance criteria. Match the actual maximum foot reaction, contact geometry and panel location to the assembly rating. A cabinet's total weight, a panel's deflection-based rating and its ultimate failure load are three different quantities.

Load applied through a roughly 1 sq in indentor (1 in square or 1.128 in diameter), representing a rack foot or caster at rest

Used across 2 Anvilfield field guides, most in Datacenter.
Updated

The support under the test panel changes the result

CISCA's published Recommended Test Procedures for Access Floors, 2007 edition, addresses test methods and reporting for access-floor performance. Tate Technical Bulletin 301 distinguishes a concentrated-load test supported on steel blocks from its design-load test performed on actual understructure. A product comparison needs the support condition as well as the force value.

Copy the panel model, pedestal and stringer arrangement into the comparison record. Also identify whether the supplied result applies to a full panel or to an altered panel with a cutout. A result for a complete assembly does not describe every local modification made during fit-out. Identify the applicable test in the load-rating review and retain the manufacturer's actual assembly record with it.

A high ultimate load can accompany a lower working rating

Tate Technical Bulletin 301 determines its system design load from the smaller of the measured yield point or half the ultimate load. In its ConCore 1000-PosiLock test, Tate reports a 1,100 lb yield point and a 3,709 lb ultimate result, then publishes a 1,000 lb design-load rating.

Half the ultimate result is 1,854.5 lb, so the lower 1,100 lb yield result controls Tate's calculation. The published 1,000 lb rating is lower again. Keep the assembly name and result type beside every quoted force.

Tate bulletin resultLoad
Ultimate test result3,709 lb
Ultimate divided by two1,854.5 lb
Yield point1,100 lb
Published design load1,000 lb

Equal contact area still needs the correct contact geometry

Tate's bulletin applies the design-load test over one square inch at the system's weakest point. A one-inch-diameter circular contact has an area of about 0.785 square inch. A round contact needs a diameter of approximately 1.128 inches to provide one square inch. Specifying a one-inch round contact therefore changes the bearing area.

At 1,000 lbf, the average contact pressure is 1,000 psi on one square inch and about 1,273 psi on a one-inch-diameter circle. This area calculation identifies a difference in contact pressure; panel bending and understructure response still come from the specified assembly test. Record both the support force and actual foot or caster contact before comparing an equipment reaction with the floor data.

Distinctions

Ultimate load
The failure result from the specified test, separate from the published working rating.
Rolling load
A wheel test incorporating movement and repeated passes. A stationary concentrated-load number does not establish the rolling rating.

Frequently asked questions

Can I divide cabinet weight by four feet?

Dividing a 2,400 lb cabinet by four gives a 600 lb average foot reaction only. Equipment position, leveling and support geometry determine the maximum reaction. Compare that maximum and its location with the installed assembly's rating, including any panel cutouts.

Is a one-inch round foot the same as one square inch?

No. Its area is approximately 0.785 square inch; a one-square-inch circle has a diameter of approximately 1.128 inches.