Field glossary · measurement
Uniform (distributed) load
A uniformly distributed load of 12 kPa applies 4.32 kN across a 600 x 600 mm panel. Tate publishes that intensity separately from its RHG_X panel's 4.5 kN concentrated-load result, which uses a 25 x 25 mm contact patch. Treat the load pattern, panel size and specified understructure as part of the rating. The supporting slab receives pedestal reactions and floor-system self-weight, so it needs a separate load schedule.
Weight spread evenly across the panel, expressed as load per unit area (psf or kPa)
Convert psf and kPa without losing the area term
NIST's Guide to the SI lists 1 pound-force per square foot as 47.88026 Pa, so 1 psf is approximately 0.04788026 kPa. A 300 psf requirement converts to about 14.36 kPa. One kN/m2 equals one kPa; kN alone is a force, not a distributed-load intensity.
Keep that distinction visible when comparing a specification in psf with a product sheet in kN/m2. Dividing a force by an area is necessary before comparing it with pressure. Conversely, a pressure rating without the area does not state how much total weight occupies the panel. The raised-floor acceptance packet should retain both the original units and the converted comparison.
Read the test basis on the 12 kPa product sheet
Tate's RHG_X product sheet, version 9 with a 2024 copyright, reports PSA MOB PF2 PS/SPU testing for an extra-heavy office-floor system. It lists a uniformly distributed load of 12 kN/m2 for the 600 mm square panel, separately from a 4.5 kN point load applied over 25 x 25 mm. Dividing that point-load result by the panel area would lose the specified contact-patch condition.
Tate requires its extra-heavy screw-down stringer system to achieve the stated extra-heavy grade and bases structural performance on the complete panel-and-pedestal system. Keep the PSA test basis, panel model and understructure together when comparing the sheet with a project's specified tests.
Against the 300 psf requirement above, 12 kPa falls short of the converted 14.36 kPa intensity. A larger concentrated-load figure elsewhere on the sheet does not close that difference. Match each specified load case to its corresponding published result in the floor-rating review.
Follow the distributed load into the pedestals
A 600 x 600 mm panel has an area of 0.36 m2. At a uniform intensity of 12 kN/m2, the total applied force is 4.32 kN. In a symmetric four-corner support model, that panel contributes 1.08 kN to each corner before self-weight is added.
An interior pedestal receiving equal quarter-panel reactions from four equally loaded neighboring panels therefore carries 4.32 kN from that imposed load. The arithmetic explains tributary area; it does not convert the reaction into a pedestal rating. Edge conditions, unequal loading and the actual stringer arrangement determine the support reactions used in the assembly design.
Add system self-weight to the structural load schedule
Tate lists 44 kg/m2 nominal system mass for RHG_X. Using NIST's standard gravity of 9.80665 m/s2, that contributes 0.431 kPa, about 9.0 psf, to the supporting structure. This dead load sits alongside the equipment load in the structural schedule.
For the 0.36 m2 interior tributary area above, system self-weight adds about 0.155 kN. Adding that to the 4.32 kN imposed-load reaction gives approximately 4.48 kN at the interior support in this equal-loading model. Record the imposed and self-weight contributions separately so a later change in panel system updates the correct part of the schedule.
Distinctions
- Superimposed load and self-weight
- Equipment and stored material add load above the floor system's own weight. A structural load schedule needs both, with the access-floor system weight listed separately.
- Contact pressure
- Pressure under a small foot describes the contact area. The panel's concentrated-load test additionally captures bending under that localized force.
Frequently asked questions
How does a 12 kPa rating compare with a 300 psf requirement?
Using NIST's conversion, 12 kPa is about 250.6 psf, leaving a shortfall of 49.4 psf against 300 psf. Keep that uniform-load comparison separate from the sheet's concentrated-load result.
Can a distributed-load result clear the delivery route?
The 4.32 kN panel-total calculation contains no wheel diameter, travel path or pass count. A rolling-load result must identify those conditions; a 12 kPa uniform-load rating does not supply them.
Sources checked
Also defined as
- Weight spread evenly over the panel, rated in lb/sq ft (psf) or kPa