Fall-of-potential

A fall-of-potential test establishes an electrode-to-earth resistance by injecting test current and sampling voltage at successive probe positions. The resulting curve must identify the grounding network that remained connected: a lone rod and a bonded site grid are different test objects. AEMC recommends readings at 5 to 10 percent spacing across a full traverse. The resistance result does not by itself verify individual bonds or safe touch and step voltages.

A ground-resistance test using separate current and potential probes at selected distances from the electrode

Used across 4 Anvilfield field guides, most in Electrical.
Updated

What the complete resistance curve establishes

For a full traverse, AEMC recommends potential-stake readings every 5 to 10 percent of the electrode-to-current-stake distance. At a 300 ft span, those increments are 15 to 30 ft. Record position and resistance together, including the changing end regions, so the reader can distinguish a stable measurement region from an isolated favorable reading.

Separate measurement validity from the required maximum resistance. Closely grouped readings establish a stable portion of the traverse under the selected comparison criterion. Whether that value meets the project requirement is a second decision. The ground-resistance guide covers the electrode and bond acceptance program; retain the curve with its specific acceptance record.

Stake distances scale with the connected grid

AEMC bases its multiple-electrode spacing guidance on maximum grid dimension, using the diagonal for a square and total length for a line of electrodes. A grid's nearest accessible ground well is only the connection point. That accessible connection does not change the network's physical extent.

AEMC's planning table pairs a 40 ft maximum grid dimension with an auxiliary current stake 300 ft away and a potential stake 186 ft away. Those are initial layout figures to verify through the measurements. An installed system with different dimensions or soil conditions needs its own supporting curve; copying the stake distances does not establish equivalent test conditions.

Where the available land cannot support the chosen layout, select a documented method suited to the system geometry. An arbitrary roadside stake location does not become remote earth because the available test lead ends there. Describe the site constraint and the selected measurement method in the report.

Identify the measurement boundaries before comparing results

Fluke states that when the electrode remains connected in parallel or series with other ground rods, the measured result represents the combined arrangement. A connected-system result and a safely isolated electrode result describe different objects. A lower number on the connected system can follow directly from the additional paths, without any improvement to the individual electrode.

Label the result with the connected components, isolation state, and test connection point. Preserve the drawing or sketch showing those boundaries. This is particularly useful when a ring, concrete-encased electrode, structural steel, and remote electrodes are bonded together: the name on the test well is not a complete description of the tested network. Fluke's earth-ground testing guidance permits disconnecting a ground system only when safe and permitted; an energized installation's protective connection must not be lifted simply to obtain an isolated-rod result.

Which grounding question does the result answer?

IEEE 81-2025 separately addresses grounding resistance or impedance at power frequency, transient or surge impedance, touch and step voltages, and grounding-system integrity. Those distinct topics explain why a single low-ohm result cannot substitute for every grounding verification. A bond measurement examines a metallic connection, while a surface-potential survey examines voltage differences a person could bridge.

IEEE lists IEEE 81-2025 as active and as superseding IEEE 81-2012. A maintenance comparison needs matching measurement boundaries as well as a method reference. A change from an isolated rod to the entire connected network changes the tested object, even when the same instrument and test-well label appear on both reports.

Distinctions

62 percent shortcut
The shortcut selects a potential-stake position under specific geometric assumptions. A complete fall-of-potential traverse supplies the position data used to examine the measurement region.

Frequently asked questions

Does a low fall-of-potential reading prove every bond is intact?

A connected earth network can retain a low resistance through its other electrodes while a particular bond is open. Verify the required bonds separately and identify each tested connection.

Sources checked

Also defined as

  • Datacenter: The 3-point method that drives current and walks a potential probe to find true earth resistance
  • The accurate three-point electrode resistance test, using a current pin and a potential pin

Where this shows up