Field glossary · business
Cost code
A cost code is the work-package identifier attached to a job transaction, such as raceway installation. Pair it with a cost type to distinguish the labor budget from the material budget for that operation. The complete budget identifier can also include the job and location. Correcting a misplaced invoice changes the operation's reported variance while leaving total job spending unchanged.
The category within a job, such as rough-in, service, or trim, that an expense is tagged to
Cost code, cost type, and general ledger account
Procore documents two required segments in its default budget structure: cost code and cost type, with sub job available as an optional segment. The work package and the resource therefore occupy different fields. A raceway operation can carry labor and material without creating unrelated names for what is still the same scope.
Procore's default cost types include equipment, labor, materials, other costs, owner costs, commitments, and professional services. Those labels are software defaults. When importing a subcontractor's ledger, compare descriptions and resource mappings before accepting matching code numbers.
The general ledger reports the company's expense categories; the job ledger retains the operation behind each charge. Use the job-costing guide for estimate comparisons and a coding dictionary for the actual field-to-office handoff.
| Field | Entry on a raceway invoice | What it identifies |
|---|---|---|
| Job | J241 | The contract receiving the charge |
| Cost code | RACEWAY | The operation being costed |
| Cost type | M | Material rather than labor |
| General ledger account | Job materials | The financial-accounting destination |
Why a reclassification changes the report, not the spend
Raceway has a material budget of $14,000; devices have $10,000. The combined $24,000 budget matches total posted cost, but a $2,000 device invoice sits in the raceway account. Reclassify the invoice without entering a second purchase.
The corrected raceway variance is $14,500 minus $14,000, or $500 over budget. Devices are $500 under. The transfer removes a coding distortion; the remaining variance still needs an operating explanation.
Retain the invoice identifier, original code, destination code, correction date, and approval with the reclassification. A later report should distinguish a corrected posting from a newly received invoice. Apply the same distinction to purchase-order commitments, so a commitment and its eventual invoice are not added together as separate purchases.
| Material operation | Budget | Posted before correction | Posted after correction |
|---|---|---|---|
| Raceway | $14,000 | $16,500 | $14,500 |
| Devices | $10,000 | $7,500 | $9,500 |
| Total | $24,000 | $24,000 | $24,000 |
Direct and indirect costs need a consistent policy
On contracts applying FAR 31.202, costs incurred for the same purpose in like circumstances cannot be charged directly when their counterparts are included in an allocated indirect-cost pool. Moving a receipt into an overhead code does not establish that its accounting treatment is correct.
FAR 31.203 requires logical indirect-cost groupings and allocation bases that reflect the benefits received by the cost objectives. Write the coding instruction around the reason for the cost and the applicable allocation policy. A code named general conditions is a reporting destination; it does not settle whether a particular charge belongs in a direct contract account or an indirect pool.
Distinctions
- Schedule of values
- A billing line groups value for payment. Its scope can combine several internal cost codes, so billing-line revenue and cost-code expense need an explicit mapping before comparison.
Frequently asked questions
Can I rename a cost code halfway through a job?
A spelling correction can retain the code identifier. A scope change needs a dated mapping: document which transactions stay under the old meaning and which move to the replacement. Otherwise a trend report combines two different operations under one label.
Is a labor cost code also the prevailing-wage classification?
The operation being costed and the worker's wage classification are separate attributes. A single operation can include workers in different classifications without changing its cost-code identity.
What belongs in a cost-code dictionary?
Include the identifier, included scope, excluded scope, allowed cost types, and the person who resolves an ambiguous charge. For a mixed invoice, record a line-by-line allocation whose total equals the original invoice amount.
Sources checked
Also defined as
- Concrete: The operation the hours and quantities both charge against, such as wall formwork or rebar, so the rate lands where you can act on it
- A sub-bucket inside a job, such as rough-in or trim, so cost lands where you can use it