PFC
On a commissioning schedule, PFC means pre-functional checklist: an equipment-specific record used to establish readiness for functional testing. On an Ethernet fabric, it means priority flow control, the pause mechanism applied to selected traffic classes. Electrical submittals also use PFC for power factor correction. Spell out the requested deliverable; a signed equipment checklist, queue pause statistics and corrected power factor are three different acceptance records.
Priority flow control, a link-layer pause that stops a traffic class to prevent drops but can cause head-of-line blocking and stalls
What a commissioning PFC needs to prove
The VA Whole Building Commissioning Process Manual, section 7.13, includes installation, manufacturer startup, balancing and applicable third-party testing in pre-functional checklist readiness. The project’s checklist can therefore include completed startup evidence as well as static inspection; treating every PFC as a de-energized-only form narrows its scope incorrectly.
The same VA manual calls for manufacturer, model and serial-number data on the checklist and field spot checks by the commissioning agent. Use an equipment identifier that matches the installed tag, attach the actual startup and test records, and carry unresolved items into the issue log. Twenty signed forms for twenty pumps do not demonstrate readiness when several forms describe a different model.
A completed PFC supplies prerequisites for functional testing; it does not demonstrate that alarms, interlocks and operating sequences respond correctly under test. Separate checklist completion from the functional-test result in the turnover register.
Match host priorities to the switch queue map
IBM’s AIX guidance identifies eight PFC priority levels, numbered 0 through 7. The priority label is not an application name: classify the packets and follow their mapping through the adapter and switch before deciding which traffic receives pause treatment.
IBM describes agreement through manual settings and Data Center Bridging Exchange, or DCBX. A host configured for one priority and a switch treating another as lossless do not provide a consistent class for the same packets. Preserve the host marking, ingress trust policy, internal priority and egress queue mapping together.
XOFF and XON thresholds create buffer hysteresis
NVIDIA’s Cumulus Linux 5.15 documentation gives a PFC configuration example that sends pause at 10,000 bytes of reserved-buffer use and stops pausing after consumption falls to 8,000 bytes. The 2,000-byte difference is hysteresis, keeping the transition from oscillating at a single occupancy value.
Cumulus Linux derives buffer limits when the PFC profile is applied. Hardware buffer allocation, packet size, cable delay and link speed determine the operating configuration. A recorded XON delta and an absolute XON threshold use different representations: subtract the delta from XOFF when translating the 10,000-byte example.
Measure paused duration as well as frame counts
NVIDIA’s Cumulus Linux 5.15 PFC statistics report received and transmitted pause duration separately from received and transmitted pause-frame counts for each switch priority. Counts alone cannot establish the fraction of an interval during which a queue was blocked.
Two seconds of accumulated pause duration during a ten-second window represents 20% paused time for that counter. Verify the counter’s units and reset behavior, and distinguish received pauses that block local transmission from pauses the port sends to its peer. Align both with queue occupancy in the network observability record.
Distinctions
- Power factor correction
- On an electrical submittal, PFC changes the current demand associated with real power. Use kW, kVA, true PF and harmonic data to identify that scope; Ethernet pause counters and commissioning signatures do not measure it.
Frequently asked questions
Which standard names the Ethernet mechanism?
IEEE 802.1Q-2022 covers the bridged-network framework that includes PFC. Switch and adapter documentation defines the implementation’s settings and counters.
Does enabling PFC prove a lossless application path?
The evidence must include consistent classification and working pause behavior at the relevant links under load. A configuration flag alone does not describe application delivery.
Is a PFC signature permission to energize?
The project’s release procedure decides that. A pre-functional checklist can document several stages of installation and startup; its title alone does not identify which energization hold point has been released.
Sources checked
- U.S. Department of Veterans Affairs: Whole Building Commissioning Process Manual, 2013, sections 7.13 and 8.7
- IBM AIX: Priority-flow-control with Mellanox Onyx and Cisco Nexus switches
- NVIDIA Cumulus Linux 5.15: Quality of Service, PFC thresholds and pause statistics
- IEEE P802.1Qdt project record, March 2026: PFC enhancements based on IEEE 802.1Q-2022
- ABB Technical Note 174, revision B, May 20, 2024: power factor correction and harmonics
Also defined as
- Pre-functional checklist documenting installation and pre-start readiness checks assigned by the plan and equipment manuals
- Pre-functional checklist, the static de-energized verification that a system is installed correctly and ready to energize