ANVILFIELD Try FieldOS

Field glossary · component

Stringer

An access-floor stringer is a panel-edge support rail ordered by its pedestal-head seat, section, gasket and fastener as well as its length. Tate's September 2025 installation manual specifies 30 inch-pounds for stringer screws, equal to 2.5 foot-pounds. Tate's February 2026 ConCore 1250 specification limits residual set to 0.010 inch after a 450 lbf midspan stringer load. Tate's owner's manual prohibits standing or placing loads on stringers with panels removed, even when the complete floor has a much higher published rating.

The horizontal member tying pedestal heads into a grid for lateral stability; bolted or snap-on, often gasketed for the air seal

Used across 2 Anvilfield field guides, most in Datacenter.
Updated

Identify a replacement stringer by its connections

Start with the floor manufacturer's component drawing and the approved understructure schedule. Photograph the member's cross-section, its end seating and the pedestal-head connection. Include any factory gasket and the fastener specification in the replacement request. A member that reaches between the heads can still have the wrong bearing surface or connection geometry.

Tate's ConCore 1250 HPL bolted-stringer specification, revised February 2, 2026, calls for four-foot stringers arranged in a basketweave grid. Its support-component options distinguish a coated steel stringer from a galvanized box stringer with a factory gasket. Those are identifiable assemblies, not interchangeable descriptions of a piece of steel. Attach the exact understructure designation to a replacement order, alongside the layout records described in the raised access floor installation guide.

What torque belongs on a stringer screw?

Tate's September 2025 installation manual specifies 30 inch-pounds of torque for its stringer screws. That is 2.5 foot-pounds, calculated by dividing by 12. A setting of 30 foot-pounds would apply twelve times the specified torque. Put the unit next to the number on the work instruction and use a driver that controls this low torque.

The same Tate manual explains that overtightening spreads the bottom of the stringer section, while undertightening leaves the assembly loose and affects electrical continuity. A distorted connection therefore needs more than another pass with the driver. Inspect the screw seat and section shape before returning the panel, and identify damaged parts for replacement.

Read the stringer load test separately from the panel rating

Tate's February 2026 ConCore 1250 HPL specification requires its stringer to withstand 450 lbf applied at midspan through a one-square-inch contact area, with permanent set no greater than 0.010 inch after unloading. This is a component qualification value for that specification. The 1250 in the floor product name does not turn the stringer into a 1,250 lbf exposed beam.

For a measured residual movement of 0.008 inch, the margin to that stated permanent-set limit is 0.002 inch. A residual movement of 0.012 inch exceeds it by the same amount. Those comparisons concern movement remaining after unloading; the deflection while loaded is a separate reading. Keep the contact area and support arrangement attached to any test result so a different setup is not compared with this rating.

Why panels stop fitting after underfloor access

Tate's ConCore and All Steel owner's manual limits removal to six adjacent panels at once, or alternating panels in a row, while access progresses. It also identifies two-foot stringer systems as more susceptible to racking than four-foot systems. The surrounding installed panels help preserve squareness; pulling a broad opening removes that restraint.

Tate prohibits walking on exposed stringers or loading them with panels removed. Its maintenance guidance also warns against hammering the grid back into square because dents on the upper surface create rocking panels. When panels become tight after cable work, look for rotated pedestal heads and shifted connections, rather than trimming previously fitting panels to hide the movement.

Distinctions

Stair, dock or formwork stringer
These names identify members in different load paths. Order an access-floor stringer by the floor system and component designation; a request for a 'stringer' alone does not identify the product or its rating.

Frequently asked questions

Does a stringer gasket replace the bonding connection?

The gasket and electrical connection perform separate jobs. Tate's bolted-stringer specification assigns positive electrical contact to the stringer-to-pedestal bolts. A correctly seated gasket does not establish that connection.

Sources checked

Where this shows up

Related guides

Next step: Find floor repair bids

Back to the full field glossary