ANVILFIELD Try FieldOS

Unit converter

Liquid flow converter

Convert liquid flow between GPM, L/min, L/s, and m3/h for pumps, fixtures, and hydronic loops.

Quick answer

1 GPM = 3.78541 L/min. 1 GPM = 0.227125 m3/h.

Show this value in every unit

Common liquid flow conversions

UnitL/minm3/h
1 GPM3.785410.227125
1 L/min10.06
1 L/s603.6
1 m3/h16.66671
1 GPH0.06309020.00378541

About this converter

Convert liquid flow between GPM, L/min, L/s, and m3/h for pumps, fixtures, and hydronic loops. It runs in your browser and works offline, so you can convert on the truck or in the field with no signal.

Common on Plumbing and HVAC work.

Calculators that use liquid flow

Liquid flow conversion FAQ

How do you convert GPM to L/min?

Multiply by 3.78541: 1 GPM = 3.78541 L/min. To convert back, 1 L/min = 0.264172 GPM.

How do you convert GPM to m3/h?

Multiply by 0.227125: 1 GPM = 0.227125 m3/h. To convert back, 1 m3/h = 4.40287 GPM.