ANVILFIELD Try FieldOS

Unit converter

Torque converter

Convert torque between foot-pounds, newton-meters, and inch-pounds for terminations and fasteners.

Quick answer

1 ft-lb = 1.35582 N-m. 1 in-lb = 0.112985 N-m.

Show this value in every unit

Common torque conversions

UnitN-mft-lb
1 ft-lb1.355821
1 N-m10.737562
1 in-lb0.1129850.0833333

About this converter

Convert torque between foot-pounds, newton-meters, and inch-pounds for terminations and fasteners. It runs in your browser and works offline, so you can convert on the truck or in the field with no signal.

Common on Electrical work.

Calculators that use torque

Torque conversion FAQ

How do you convert ft-lb to N-m?

Multiply by 1.35582: 1 ft-lb = 1.35582 N-m. To convert back, 1 N-m = 0.737562 ft-lb.

How do you convert in-lb to N-m?

Multiply by 0.112985: 1 in-lb = 0.112985 N-m. To convert back, 1 N-m = 8.85075 in-lb.