Unit converter

Airflow converter

Convert airflow between CFM, m3/h, and L/s for duct design, ventilation rates, and data-center cooling.

Quick answer

1 CFM = 1.69901 m3/h. 1 CFM = 0.471947 L/s.

Show this value in every unit

Common airflow conversions

Unitm3/hL/s
1 CFM1.699010.471947
1 m3/h10.277778
1 L/s3.61
1 m3/s36001000
1 CFH0.02831680.00786579

About this converter

Convert airflow between CFM, m3/h, and L/s for duct design, ventilation rates, and data-center cooling. It runs in your browser and works offline, so you can convert on the truck or in the field with no signal.

Common on HVAC and Datacenter work.

Calculators that use airflow

Airflow conversion FAQ

How do you convert CFM to m3/h?

Multiply by 1.69901: 1 CFM = 1.69901 m3/h. To convert back, 1 m3/h = 0.588578 CFM.

How do you convert CFM to L/s?

Multiply by 0.471947: 1 CFM = 0.471947 L/s. To convert back, 1 L/s = 2.11888 CFM.