ANVILFIELD Try FieldOS

Unit converter

Air & fluid velocity converter

Convert velocity between feet per minute, meters per second, and mph for duct and pipe sizing.

Quick answer

1 fpm = 0.00508 m/s. 1 mph = 1.60934 km/h.

Show this value in every unit

Common air & fluid velocity conversions

Unitm/sfpm
1 fpm0.005081
1 m/s1196.85
1 mph0.4470488
1 km/h0.27777854.6807

About this converter

Convert velocity between feet per minute, meters per second, and mph for duct and pipe sizing. It runs in your browser and works offline, so you can convert on the truck or in the field with no signal.

Common on HVAC work.

Calculators that use air & fluid velocity

Air & fluid velocity conversion FAQ

How do you convert fpm to m/s?

Multiply by 0.00508: 1 fpm = 0.00508 m/s. To convert back, 1 m/s = 196.85 fpm.

How do you convert mph to km/h?

Multiply by 1.60934: 1 mph = 1.60934 km/h. To convert back, 1 km/h = 0.621371 mph.