Unit converter
Pressure converter
Convert between psi, bar, kPa, inches of water column, and head — the pressure units that show up on pumps, gauges, duct static, and test reports.
Quick answer
1 psi = 6.89476 kPa. 1 psi = 0.0689476 bar. 1 psi = 27.6799 in wg.
Common pressure conversions
| Unit | kPa | psi |
|---|---|---|
| 1 psi | 6.89476 | 1 |
| 1 bar | 100 | 14.5038 |
| 1 kPa | 1 | 0.145038 |
| 1 MPa | 1000 | 145.038 |
| 1 in Hg | 3.38639 | 0.491154 |
| 1 in wg | 0.249089 | 0.0361273 |
| 1 ft of head | 2.98907 | 0.433528 |
| 1 atm | 101.325 | 14.6959 |
| 1 mm Hg | 0.133322 | 0.0193368 |
| 1 Pa | 0.001 | 0.000145038 |
About this converter
Convert between psi, bar, kPa, inches of water column, and head — the pressure units that show up on pumps, gauges, duct static, and test reports. It runs in your browser and works offline, so you can convert on the truck or in the field with no signal.
Common on Plumbing, HVAC and Datacenter work.
Calculators that use pressure
Pressure conversion FAQ
How do you convert psi to kPa?
Multiply by 6.89476: 1 psi = 6.89476 kPa. To convert back, 1 kPa = 0.145038 psi.
How do you convert psi to bar?
Multiply by 0.0689476: 1 psi = 0.0689476 bar. To convert back, 1 bar = 14.5038 psi.
How do you convert psi to in wg?
Multiply by 27.6799: 1 psi = 27.6799 in wg. To convert back, 1 in wg = 0.0361273 psi.