Unit converter
Length converter
Convert length between feet, inches, yards, and metric for layout, takeoff, and shop drawings.
Quick answer
1 ft = 0.3048 m. 1 in = 25.4 mm.
Common length conversions
| Unit | m | ft |
|---|---|---|
| 1 ft | 0.3048 | 1 |
| 1 in | 0.0254 | 0.0833333 |
| 1 yd | 0.9144 | 3 |
| 1 m | 1 | 3.28084 |
| 1 cm | 0.01 | 0.0328084 |
| 1 mm | 0.001 | 0.00328084 |
About this converter
Convert length between feet, inches, yards, and metric for layout, takeoff, and shop drawings. It runs in your browser and works offline, so you can convert on the truck or in the field with no signal.
Length conversion FAQ
How do you convert ft to m?
Multiply by 0.3048: 1 ft = 0.3048 m. To convert back, 1 m = 3.28084 ft.
How do you convert in to mm?
Multiply by 25.4: 1 in = 25.4 mm. To convert back, 1 mm = 0.0393701 in.