ANVILFIELD Try FieldOS

Unit converter

Power & cooling converter

Convert power and cooling capacity between kW, tons of refrigeration, BTU/h, and horsepower.

Quick answer

1 ton (refrig.) = 12000 BTU/h. 1 ton (refrig.) = 3.51685 kW. 1 hp = 0.7457 kW.

Show this value in every unit

Common power & cooling conversions

UnitkWBTU/h
1 kW13412.14
1 W0.0013.41214
1 hp0.74572544.43
1 BTU/h0.0002930711
1 ton (refrig.)3.5168512000
1 MBH0.2930711000

About this converter

Convert power and cooling capacity between kW, tons of refrigeration, BTU/h, and horsepower. It runs in your browser and works offline, so you can convert on the truck or in the field with no signal.

Common on HVAC, Electrical and Datacenter work.

Calculators that use power & cooling

Power & cooling conversion FAQ

How do you convert ton (refrig.) to BTU/h?

Multiply by 12000: 1 ton (refrig.) = 12000 BTU/h. To convert back, 1 BTU/h = 8.33333e-05 ton (refrig.).

How do you convert ton (refrig.) to kW?

Multiply by 3.51685: 1 ton (refrig.) = 3.51685 kW. To convert back, 1 kW = 0.284345 ton (refrig.).

How do you convert hp to kW?

Multiply by 0.7457: 1 hp = 0.7457 kW. To convert back, 1 kW = 1.34102 hp.