Convert weight between pounds, kilograms, US tons, and tonnes for material orders and load math.

Quick answer

1 lb = 0.453592 kg. 1 ton (US) = 0.907185 tonne.

Show this value in every unit

Common weight conversions

Unitkglb
1 lb0.4535921
1 kg12.20462
1 ton (US)907.1852000
1 tonne10002204.62
1 oz0.02834950.0625

About this converter

Convert weight between pounds, kilograms, US tons, and tonnes for material orders and load math. It runs in your browser and works offline, so you can convert on the truck or in the field with no signal.

Common on Concrete and Paving work.

Calculators that use weight

Weight conversion FAQ

How do you convert lb to kg?

Multiply by 0.453592: 1 lb = 0.453592 kg. To convert back, 1 kg = 2.20462 lb.

How do you convert ton (US) to tonne?

Multiply by 0.907185: 1 ton (US) = 0.907185 tonne. To convert back, 1 tonne = 1.10231 ton (US).