ANVILFIELD Try FieldOS

FieldOS for Datacenter

The field CRM for Datacenter crews.

Run datacenter jobs from the first visit to getting paid: capture the work in the field, build photo and checklist proof, send the customer a clean record, and run the operation offline. Built on the Anvilfield system, with every free datacenter calculator, checklist, and guide feeding in.

Works offline. Built for the truck, the roof, and the basement, not just the office.

CaptureProveSendGet paid

How it works

One flow, from the datacenter field to getting paid.

Capture the datacenter job in the field

Log the visit, the customer, the scope, and the readings once. No clipboard, no re-typing it at the truck.

Build the proof as you work

Before-and-after photos, checklists, and sign-offs attach to the job automatically and stay organized by stop.

Send a clean record

One link sends the customer a branded proof page with the photos and the work done, so they see a professional record.

Run the whole operation

Jobs, estimates, change orders, and customer history in one place, offline, syncing when you get signal.

Start free

The free datacenter tools that feed FieldOS.

Every Anvilfield datacenter calculator, readiness check, and field guide is free and works offline. Run them today; capture the job and the proof in FieldOS when you are ready.

Raised floor load calculatorCheck the uniform load a cabinet puts on a raised access floor (psf) against the floor rating before you roll it into place.Rack airflow CFM calculatorFind the CFM a rack needs from its kW load and the supply-to-return temperature rise: CFM = kW x 3412 / (1.08 x deltaT).Rack current & sizing calculatorConvert rack kW to amps (single or three phase) and size the continuous feeder and breaker at 80% per the NEC.UPS runtime calculatorEstimate how long a battery or UPS holds a load: runtime = usable kWh x efficiency / load kW.PUE calculatorFind a data center's Power Usage Effectiveness: total facility power divided by the IT load, plus DCiE and the overhead in kW.Redundancy capacity calculatorFind the usable capacity of a UPS, generator, or cooling plant under N, N+1, or 2N, and check it carries the critical load with a unit down.Turnover and closeout readinessA 2 minute check before you call a job done, so a missing as-built or test report does not hold your retention hostage.Switchgear delivery readinessA 2 minute readiness check before the gear hits the dock, so a tripped indicator or a missed claim window does not become your problem.BIM coordination readinessA 2 minute check on whether your model coordination actually resolves clashes before the field, before a duct meets a beam on site.Connected jobsite readinessA 2 minute check on whether your IoT and RTLS data actually changes decisions, with the connectivity, platform, and privacy to make it work.

Offline datacenter field apps

Run your next datacenter job through FieldOS.

Open it in your browser or on the app and capture your next visit, nothing to install to try it. The customer gets a clean, branded proof record: the before-and-after photos, the completed checklist, the work done, and the sign-off, in one link.