Quality control is the contractor's process testing; quality assurance is the owner's independent verification and acceptanceIn: Asphalt paving inspection
Quick-opening device, an accelerator or exhauster that speeds the trip and the air clearing on a larger systemIn: Dry-pipe and pre-action trip test
Qualified opportunity
A sales record with supported physical fit, buying responsibility and a defined commercial next action. Keep the qualification evidence separate from the original building or equipment observation.In: Building and asset intelligence glossary
Qualified person
A person trained in the construction and operation of the electrical equipment and its hazards, who establishes and verifies the safe work conditionIn: Lockout/tagout field guide