The average force in the tendon over its length, after friction and seating lossesIn: PT slab stressing
P / w (service load)
The unfactored column load in pounds, or wall load in pounds per foot, the footing carriesIn: Foundation types and footings
P abs
Absolute pressure on the water at the suction source, in feet: atmospheric on an open system, fill pressure on a closed loopIn: Pump cavitation and NPSH field guide
P and K rating
Phosphorus and potassium reported low to optimum against a turf target, telling you whether to add themIn: Turf fertilization and soil testing
P and P bonds
Performance and payment bonds, issued together, guaranteeing completion and payment to subs and suppliersIn: Contractor insurance and bonding
The failure path from potential failure (P, first detectable) to functional failure (F); the interval between is the window to actIn: Predictive maintenance guide
P-T chart
Pressure-temperature chart for a specific refrigerant, converting a measured pressure to a saturation temperatureIn: Refrigerant charging field guide
A base trap that helps lift oil up a riser; an inverted top trap that stops oil draining back when the header is above the evaporatorIn: Refrigerant line sizing field guide
P_elev
Static head loss lifting water to the highest fixture, about 0.43 psi per foot of riseIn: Water supply pipe sizing guide
P_meter / P_bf
Pressure loss through the water meter and any backflow preventer at the design flow, from the device dataIn: Water supply pipe sizing guide
P_res
Minimum residual flowing pressure the worst fixture needs to operate, left on the budgetIn: Water supply pipe sizing guide
P_supply
Minimum daily service pressure at the source, in psi, the guaranteed low, not the peakIn: Water supply pipe sizing guide
PACE
Property Assessed Clean Energy financing, repaid through an assessment on the property tax billIn: HVAC customer financing guide
Pachometer
A cover meter that uses an electromagnetic field to find shallow rebar and measure cover; steel only, not deepIn: Concrete scanning before you drill
Pack-back
Returning the cleaned and stored contents to the finished structure, reconciled and signed offIn: Contents pack-out and inventory
Whole refrigeration circuit in one cabinet, versus an indoor unit and outdoor unit joined by a refrigerant line setIn: HVAC system types field guide
Packet loss
Packets dropped in the fabric, which forces a retransmit and stalls the synchronized collective the GPUs are waiting onIn: Network observability for the AI fabric
Packing
Braided rings squeezed around the shaft in a stuffing box; the older seal type, meant to weep a controlled dripIn: Hydronic pump install field guide
Permit authorizing individual, the trained person who surveys the area, sets the precautions and monitoring duration, and signs the permitIn: Hot work permit field guide
Panel replacement
Swapping the load center on the same service, keeping the existing amperageIn: Service and panel upgrade
Panelboard / load center
The dead-front assembly that splits a feeder into protected branch circuits; load center is the residential nameIn: Panelboard installation
PAPA
Positive air pressure attenuator, an engineered device that absorbs positive pressure transients an AAV cannot relieveIn: AAV and island vent guide
Storage that stripes files across many nodes so they serve throughput in parallel, scaling bandwidth with node countIn: AI storage tier architecture
Parallel neutral path
Neutral current riding on the grounding system because the neutral is bonded to ground in more than one place; the source of nuisance trips and shock hazardIn: Generator grounding and bonding
Parallel optics
A transceiver transmitting and receiving on multiple fibers at once, plugging into a native MPOIn: MPO/MTP polarity methods
Parallel set
One conductor of each phase, plus neutral and equipment ground, run together as one circuit's worthIn: Parallel conductors, NEC
A land-record unit with an identifier in a particular jurisdiction. Store that jurisdiction with the identifier. Link buildings to parcels explicitly when a site spans boundaries or contains several structures.In: Building and asset intelligence glossary
Localized insulation breakdown at a defect that erodes the insulation before it flashes over; tested online or offlineIn: MV switchgear maintenance and testing
Partial discharge (PD)
A tiny localized discharge in a void or defect under voltage, the mechanism that erodes insulation and a key termination diagnosticIn: MV cable termination and testing
Particulate / filtration
Suspended solids in the coolant, removed by full-flow and side-stream filters rated to the cold-plate channel sizeIn: Liquid cooling loop chemistry
Cutting the highest flow rate leaving the site by storing water faster than the outlet releases it, the core job of a basinIn: Detention and retention ponds
The perc test measures how fast soil drains in minutes per inch; the soil evaluation reads texture, limiting layer, and water table to set feasibility and designIn: Septic system field guide
Perforated backing
Turf backing with drainage holes; fully permeable backing drains across the whole surface for higher flowIn: Artificial turf installation
Final yield divided by irradiation-based reference yield at the stated measurement boundaryIn: Solar PV O&M field guide
Pergola
Posts and crossbeams with an open or louvered roof, for partial shade and airflow, free-standing or attachedIn: Pergola and shade structure guide
Perimeter control
Fencing, gates, and one controlled entrance that limit where the site can be entered and let you see who comes and goesIn: Jobsite security and theft prevention
Perimeter catches entry at doors and windows; interior catches movement inside with motion detectors; layered so each covers the other's missIn: Intrusion alarm field guide
Periodic inspection
The annual federal inspection of a commercial motor vehicle under 49 CFR 396.17, at least once every 12 monthsIn: Fleet maintenance program
A surface that passes water through it into a stone reservoir; porous usually means through the body (asphalt, concrete), permeable through the joints (pavers)In: Porous and permeable pavement
Permeable base / OGDL
Open-graded drainage layer under the surface that drains the whole footprint to a collector or daylightIn: Pavement subdrains and edge drains
Permeation grouting
Injecting low-viscosity grout into the pores of granular soil to bind the grains and cut permeabilityIn: Ground improvement and grouting
Permit authorizing individual (PAI)
The person under NFPA 51B who authorizes hot work, confirms the area is safe, and sets any extended monitoringIn: Fire watch and impairment
Permittivity vs transmissivity
Permittivity is water flow across the fabric; transmissivity is water flow in the plane of the fabric for drainage.In: Geotextile separation fabric
Perpetual pavement
A thick section designed so fatigue never reaches the bottom of the asphalt; renewed by resurfacingIn: Asphalt pavement thickness design
Open-graded, near-zero-fines concrete with interconnected voids that water drains through; also porous or permeable concreteIn: Pervious concrete field guide
PEX
Cross-linked polyethylene, a flexible plastic potable water tube in types a, b, and cIn: PEX, copper, and CPVC methods
Building a point cloud from many overlapping photographs, cheaper and full color, with softer geometry than lidarIn: Reality capture and scan-to-BIM
Photogrammetry / orthomosaic
Stitching overlapping aerial photos into a geometrically corrected, measurable map and a 3D model of a site or structure.In: Drone inspection field guide
Physical / gradation segregation
Separation of coarse from fine aggregate, leaving stone-rich or sand-rich areasIn: Asphalt segregation
PI (polarization index)
Ratio of the ten-minute to one-minute insulation-resistance reading; above 1.0 is the NETA floorIn: Padmount transformer energization
Pick radius
The horizontal distance from the crane's center of rotation to the load, which sets the rated capacity for that liftIn: Jobsite logistics field guide
Pickup / dropout
The voltage and frequency thresholds at which the controller accepts or rejects a sourceIn: ATS commissioning field guide
Pickup and delay
The current at which a function starts to act and the time it waits; the two settings that fit a curve between the load below and the source aboveIn: Coordination study field guide
Pickup and time delay
The ground current that triggers the trip and the deliberate wait before it actsIn: GFPE field guide
Potential-induced degradation is associated with electrical stress; distinguish it from other degradation mechanisms and the product warranty curveIn: Solar PV O&M field guide
PID / hunting
Proportional-integral-derivative control of modulating outputs; hunting is the oscillation of a mistuned loop around setpointIn: BMS and DDC controls commissioning
A prefabricated membrane cone that flashes a round pipe, welded or bonded at the base and clamped at the topIn: Roof penetration flashing
Pipe bursting
Replacing a pipe by pulling a bursting head through it that shatters the old pipe and pulls in new HDPEIn: Trenchless sewer repair field guide
Pipe-clamp probe
A thermocouple or thermistor strapped to a refrigerant line; accuracy and insulation from ambient air decide superheat and subcoolingIn: HVAC test instruments field guide
PIR senses a moving heat signature; dual-tech adds microwave and alarms only when both agree, which cuts false alarms from HVAC and sunIn: Intrusion alarm field guide
PIR / ultrasonic / dual-tech
Heat-motion line-of-sight, sound-echo fine motion, and both combined to cut false tripsIn: Lighting controls and dimming
Piston / cup
The molded cup that meters a piston flushometer; more tolerant of dirty water than a diaphragm.In: Flushometer flush valve types
Pitch / slope
Rise over run in inches per 12 in, written like 6:12, which sets the slope factorIn: Roof measurement and squares
A pourable sealer pocket flashed around an odd penetration and filled with sealant; the last-resort detailIn: Roof flashing types
Pitch pocket
A sealant-filled box sealing an odd-shaped penetration; the filler shrinks and needs topping on a scheduleIn: Roof maintenance program
Pitch pocket / pourable pocket
An open metal collar around an irregular penetration filled with pourable sealer; a maintenance item and last resortIn: Rooftop equipment supports and walkways
Pitless adapter
The fitting that takes water out of the casing horizontally below the frost line, replacing the old well pitIn: Water well drilling and well systems
Pitot traverse
A grid of velocity-pressure readings across a duct, averaged to get true average velocity and then airflowIn: Air balancing report field guide
Pixels per foot (ppf)
Horizontal pixels landed on each foot of the scene at the target distance; the metric that decides whether footage is usableIn: CCTV system design field guide
Placement
Getting fresh concrete into the forms and around the reinforcement near its final positionIn: Placement and consolidation
Placement temperature
The air and surface or base temperature at the time of paving; many specs require both above the minimum and risingIn: Cold-weather asphalt paving
Placing drawings
The detailer's plans and sections showing every bar set in place and tagged with its markIn: Rebar detailing and the BBS
Planarity / flatness tolerance
The allowed surface deviation under a straightedge, commonly 3 mm under 1 m and 6 mm under 4 mIn: Running track surfacing
The percentage of the media surface the intended plants cover, commonly targeted near 80 to 90 percent within about two yearsIn: Green roof maintenance program
Plant factor / water budget
A plant's water use as a fraction of reference ET, used in ordinances like MWELO to cap a project's landscape waterIn: Xeriscape and drought-tolerant design
Plant health care (PHC)
A proactive program of scheduled inspection and care that keeps plants healthy by managing soil, roots, water, and nutrition, with pest control as one partIn: Plant health care (PHC)
Plant schedule
The table on a planting plan listing each plant by botanical name, size, quantity, spacing, and conditionIn: Landscape design and plant selection
A priced promise to replace plants that die within a set period, bounded by written exclusionsIn: Landscape estimating and bidding
Plaster start-up
The procedure for a new plaster or aggregate finish: a continuous fill, frequent brushing, and careful chemistry through the first days so the curing surface does not stain or etch.In: Commercial pool construction
A device connected to the water system that delivers water for use or receives waste, such as a toilet, lavatory, sink, urinal, shower, or drinking fountainIn: Fixtures and water efficiency
Plumbing rough
The main drains, returns, skimmers or gutter, and supply lines set and pressure-tested before the shell, so the shotcrete encases them in the structure.In: Commercial pool construction
Plumbing-up
Pulling the frame true with guys and come-alongs to within AISC 303 tolerance before connections are finalizedIn: Steel erection and connections
Plus or minus 7 percent
The common acceptance band for measured versus calculated elongation, per ACI 318 and PTIIn: PT slab stressing
Plus/minus 400 V
A bipolar DC designation with 800 V between the positive and negative rails; voltage to earth depends on grounding and fault stateIn: Rack DC power distribution (HVDC)
Ply / ply felt
A reinforcing sheet of organic or fiberglass felt; the layers built up into the membraneIn: Built-up roof installation
PM
Preventive or planned maintenance, the scheduled servicing done on an interval rather than after failureIn: Fleet maintenance program
PM / PdM
Preventive maintenance on a schedule; predictive maintenance driven by condition data and trendingIn: HVAC preventive maintenance guide
PM compliance
Percentage of scheduled PM completed on time within its window; the program's core metricIn: Data center PM program
PM program
The full scheduled and condition-based maintenance regime for the critical power and cooling plantIn: Data center PM program
Protected membrane or inverted assembly, with the insulation and ballast placed on top of the membraneIn: Ballasted roof systems
Pneumatic test
A pressure test using air or gas, allowed only when hydrostatic is impractical, because compressed gas stores far more energy and fails dangerouslyIn: Chilled water hydro test package
Verifying each physical point one at a time so the field device matches the BMS value and each output moves the right equipmentIn: BMS and DDC controls commissioning
Poisson effect
The pressure-driven shortening of HDPE that can pull an unrestrained transition joint apartIn: Thrust restraint field guide
Water standing on a low-slope roof more than 48 hours after rain in drying weather, per NRCAIn: Roof ponding water
Pondless
A feature with no standing water; it recirculates into a hidden gravel or matrix basinIn: Water feature installation
Pool circulation
Pulling the water from the main drain and skimmers through the pump, filter, and heater and back through the returns, continuouslyIn: Pool and spa mechanical systems
Popout
A conical hole with fractured aggregate at the bottom, from unsound, reactive, or frozen aggregateIn: Concrete surface defects diagnosis
Porous / permeable asphalt
Full-depth open pavement over a stone reservoir for stormwater infiltrationIn: Asphalt mix types by layer
Porous vs non-porous
Porous materials like drywall and insulation are removed; non-porous like studs, metal, and glass are cleanedIn: Mold remediation field guide
Positive displacement
Compression by trapping a fixed volume of vapor and shrinking it; recip, scroll, screw, rotaryIn: HVAC compressor types
Stressing tendons after the concrete has cured, putting the slab into compressionIn: PT slab stressing
Post-tension (PT)
Tensioned steel tendons in a slab; cutting one releases stored energy explosivelyIn: Concrete cutting and coring
Post-tension tendon
A high-strength strand stressed to load the slab in compression; cutting one releases stored energy and weakens the structureIn: Concrete scanning before you drill
Post-tension tendon corrosion
Corrosion of stressed strand after grease-and-sheath protection fails in an unbonded tendon or grout protection fails in a bonded tendon; requires engineered investigation and repairIn: Parking structure restoration
Post-work monitoring
The period after the fire watch ends during which the area is checked for smoldering fire, set by the PAI to the riskIn: Hot work permit field guide
A metal or molded box flashed to the roof and filled with pourable sealant; the last-resort penetration detail, also called a pitch pocket or pitch panIn: Roof penetration flashing
Power budget
Transmitter power minus receiver sensitivity, the loss the optics tolerateIn: Fiber splice loss budget
Power cabinet vs dispenser
In a split architecture, the central rectifier cabinet against the stall unit with the connector and cableIn: DC fast charging station design
Power capping
A hard limit on how much a device, rack, or row can draw, enforced by throttling before the budget is exceededIn: Power capping and oversubscription
Prefabricated electrical plant: switchgear, transformer, UPS, transfer switches, and distributionIn: Modular data center deployment
Power shelf
An assembly of conversion modules supplying the rack DC bus, with voltage, redundancy and service conditions defined by the architectureIn: Rack DC power distribution (HVDC)
Power is a short hard burst (ride-through); energy is sustained output over hours (autonomy and grid services)In: Data center battery and storage types
Power-vented / Category III
A gas unit with a powered vent that pushes flue products out, often a sidewall, against positive pressureIn: Unit heater field guide
Powered anode
Impressed-current titanium rod that protects the tank without being consumedIn: Water heater maintenance
Pozzolanic reaction
The slow lime-clay reaction at high pH that forms cementitious bonds and long-term strengthIn: Subgrade stabilization
Permit-required confined space: a confined space that also holds a serious hazard such as bad air, engulfment, or entrapmentIn: Confined space entry field guide
Dry system whose valve is released by the fire alarm panel, keeping water out of the pipe until a fire is confirmedIn: Dry-pipe and pre-action trip test
An herbicide that stops weed seed before it germinates versus one that kills a weed already growingIn: Landscape IPM field guide
Pre-engineered metal building (PEMB)
A steel building system the manufacturer engineers and fabricates as a kit of rigid frames, secondary, bracing, and panels, shipped to the site to erectIn: Metal building erection
The daily living hazard plan a crew completes for the actual conditions that morning, derived from the JHA or AHAIn: Daily huddle field guide
Pre-task plan / FLRA
The crew's field-level risk assessment of today's specific work and conditions, done before the task startsIn: JHA, toolbox talks, pre-task planning
Pre-wetting
Soaking the aggregate before batching so it does not steal mix water or lose slumpIn: Lightweight concrete
Preaction system
Dry pipe with water held back until fire detection (single- or double-interlock) acts; used for sensitive contentsIn: Fire sprinkler system design guide
Precast
Concrete cast before installation in its final position; this guide addresses plant-cast membersIn: Precast erection and connections
Precharge
The air pressure on the dry side of the expansion tank, set to the cold fill pressure before the loop is filledIn: Hydronic water and glycol field guide
Precipitation rate
The depth a zone applies per hour, in inches per hour, used to set run timeIn: Sprinkler system design
The share of returned positive detections that are supported positives. Divide true positives by all returned positives. State whether the denominator is objects, buildings or another counting unit.In: Building and asset intelligence glossary
Preconstruction
The planning phase before construction, where the team prices the design, checks constructability, value-engineers, schedules, and locks the budget.In: Preconstruction field guide
Predictive maintenance (PdM)
Condition-based maintenance triggered by measured data (IR, vibration, oil, ohmic) before failureIn: Data center PM program
Predictive twin
A connected twin plus simulation that forecasts behavior and runs what-if scenariosIn: Digital twin for operations
Prefabricated vs modular
Prefabricated means built off site in a plant; modular means designed in repeatable blocks that scale by additionIn: Modular data center deployment
A vent that opens only during the discharge pressure spike so a sealed room is not damagedIn: Clean agent room integrity
Pressure switch
The safety that proves the inducer is moving air before the gas valve can openIn: Gas furnace field guide
Pressure switch (well)
The control that starts and stops a well pump at a cut-in and cut-out, commonly 40/60 psi, with the tank pre-charged just below cut-inIn: Low water pressure guide
Pressure washing
Cleaning hard, durable surfaces with high-pressure water, commonly 2,500 to 4,000 PSI, that mechanically blasts dirt offIn: Pressure and soft washing
A box with no flow sensor that commands a damper position only, so airflow rides with duct staticIn: VAV box commissioning field guide
Pressure-equalized rainscreen
A drained, vented glazing pocket that equalizes air pressure so water is not driven in, then weeps out what gets past the outer seal.In: Curtain wall and glazing
Pressure-independent
A VAV box with a flow sensor that holds its airflow setpoint regardless of upstream duct pressure changesIn: VAV box commissioning field guide
Pressure-injection injury
A high-pressure stream puncturing skin and injecting fluid into tissue, a surgical emergency that looks minor at firstIn: Pressure and soft washing
Facility water (FWS) on the building side, technology cooling system (TCS) coolant on the clean rack side, separated by the CDU heat exchangerIn: CDU commissioning
Primary air
The ducted, dehumidified ventilation air supplied to an active beam, which also drives the inductionIn: Chilled beam commissioning
Pipe systems carrying process fluids, chemicals, gases, and steam in a plant at pressure and temperature, under ASME B31.3In: Industrial process piping
Proctor / percent compaction
A lab test of maximum dry density and optimum moisture; field fill is compacted to a percentage of itIn: Site grading and earthwork
Proctor density
The lab maximum dry density a soil or aggregate compacts to; CMHA PAV-TEC-002-22 base targets are at least 98% of the applicable standard or modified Proctor maximumIn: Paver hardscape installation
Production derate
The drop in pounds per day from rated ideal conditions to the real higher air and water temperatures of the roomIn: Commercial ice machine field guide
Earned hours divided by actual hours; above 1.0 the crew beats the budget, below 1.0 it loses (confirm which way your report runs)In: Construction labor productivity tracking
Methods banned on lead paint: open-flame burning, power sanding or grinding without HEPA, heat guns above about 1100 degrees F, and dry scraping or sanding beyond small areasIn: Lead-safe renovation (RRP)
State statutes setting payment and retainage release deadlines and interest for late or wrongful withholding; nearly every state has one and the details differ.In: Retainage and retention field guide
Proof of work
A photo that backs a billed item, milestone, or completed scope, answering whether the work was actually performedIn: Field photo documentation
Proof packet
The single reviewable record that proves a scope was installed, tested, and accepted: the photos, tests, checklists, punch closeout, material records, and signoffs, tied to a locationIn: Proof packet assembly
Proof roll
Driving a loaded truck over the subgrade to find soft spots by rutting, deflection, or pumpingIn: Subgrade stabilization
The located, dated photo record that follows the building into operations, the as-built and equipment set the owner runs againstIn: Field photo documentation
The low-toxicity glycol (FDA generally recognized as safe) used in occupied-building HVAC; higher viscosity, slight heat-transfer penaltyIn: Hydronic water and glycol field guide
Propylene glycol (PG)
The common glycol in the secondary loop, often near 25 percent (PG25), for freeze protection and biostatic effect at a heat-transfer penaltyIn: Liquid cooling loop chemistry
The traceable source history behind a claim. Include the source reference, observation date, extraction method, reviewer and revisions. A later researcher should be able to find the evidence and understand the original decision.In: Building and asset intelligence glossary
Proximity warning system
A detection system that senses when a person or object enters a zone around a machine and alerts the operator, the worker, or both. Also called a proximity detection system.In: Proximity warning and struck-by safety tech
The pressure and temperature ports on a balancing valve, read with a DP gauge for flow and a probe for water temperatureIn: Hydronic balancing field guide
PTAC
Packaged terminal air conditioner, a through-wall assembly with model-specific cooling and heating arrangementsIn: PTAC and PTHP field guide
A policyholder representative whose claim negotiation requires the license and role allowed by the applicable stateIn: Storm and hail damage restoration
Enclosure where conductors are pulled, routed, or spliced between raceways, sized by 314.28 geometryIn: Pull box sizing, 314.28
Pull planning
The trades planning backward from a milestone together, each owning its durations and handoffs, so the plan has buy-inIn: Lean construction field guide
Pull planning / Last Planner
Trades build the sequence backward from a milestone so they own itIn: Project scheduling
Piping the pump to pump away from the expansion tank so its differential pressure adds to the suction, raising NPSHaIn: Pump cavitation and NPSH field guide
Placing the pump so it pushes water away from the expansion tank, adding its head to the loop instead of subtracting itIn: Expansion tank and air field guide
A sector on a wheel that flushes carried-over exhaust before the matrix rotates into the supply streamIn: ERV commissioning field guide
Purlin / girt (secondary)
Cold-formed Z or C members that span between frames to carry the roof (purlins) and wall (girts) panels and brace the framesIn: Metal building erection
Purple pipe
The purple-colored or purple-marked piping that identifies non-potable reclaimed, rain, or graywaterIn: Graywater and rainwater harvesting
Purple pipe / Pantone 512
The reclaimed identification color, carried in pipe, tape, tags, and boxes with a do-not-drink warningIn: Reclaimed water and purple pipe
A steel pier driven by hydraulic ram using the building's weight as reaction, for settlement repair and liftIn: Foundation underpinning and repair
Push-pull
A fast recovery method for large liquid charges that drives liquid into the cylinder using machine-generated pressureIn: Refrigerant leak detection field guide
Pressure or atmospheric vacuum breaker; protects against back-siphonage only, not backpressureIn: Cross-connection control
PVB / SVB
Pressure vacuum breaker and its spill-resistant version, a check plus an air inlet for backsiphonage only (ASSE 1020 / 1056)In: Backflow test procedure guide
PVC
Polyvinyl chloride, a heat-weldable thermoplastic membrane, the chemical and grease resistance leaderIn: TPO vs EPDM vs PVC
A fluoropolymer coating resin; verify the finished coating specification and warrantyIn: Standing seam metal roof
PVDF / Kynar vs SMP
PVDF is a fluoropolymer coating; SMP is silicone-modified polyester. Compare each finish's chalk and color-change limits and observed weathering.In: Metal roof types compared