ANVILFIELD Try FieldOS

Field glossary

Terms — M

247 field terms starting with M, 34 with a full reference page. Each links to the Anvilfield guides where the term is used on the job.

M
Multiplier that reduces upstream fault current to the downstream point, 1 / (1 + f)In: Available fault current study
M / K rating
Crash-test ratings for vehicle barriers under ASTM F2656; M50 equals the older K12In: Commercial fence and gate install
M&IE
Meals and incidental expenses, the food-and-tips portion of per diem, often paid at a partial rate on travel daysIn: Hours, overtime, and per diem proof
M&O
Management and operations, the Uptime Institute assessment of the operations programIn: Data center MOP SOP EOP
m2, m3
Drainage coefficients applied to the unbound base and subbase, adjusting for how well they drainIn: Asphalt pavement thickness design
MAC
Move, add, or change to the plant; each one ends in an as-built record and label update or the administration driftsIn: Data center rack cable managementTIA-606 labeling and administrationDCIM and asset managementCross-connect patch records
Machine-room-less (MRL)
A traction elevator with the compact machine inside the hoistway instead of a separate machine roomIn: Elevator modernization and maintenance
Macro fiber
Larger fiber at or above about 0.3 mm, synthetic or steel, that provides post-crack residual strengthIn: Fiber-reinforced concrete
Magnetic dirt separator
A separator with a magnet that captures magnetite from the flow, blown down or wiped clean on a scheduleIn: Hydronic water and glycol field guide
Magnetite
Black iron-oxide sludge from corroding steel; abrasive to the pump and insulating on coils, and the thing a magnetic separator targetsIn: Hydronic water and glycol field guide
MAHC
The CDC Model Aquatic Health Code, a model code many jurisdictions adopt or adapt for commercial pool depth, markings, slopes, drains, decks, and operation.In: Commercial pool construction
Main / exit cleanout
The cleanout serving the building drain to sewer junction, the access to the whole mainIn: Plumbing cleanout field guide
Main bonding jumper
The connection of the grounded service conductor to the service-disconnect enclosure and equipment grounding conductors under NEC 2023 Section 250.24(C)In: Service and panel upgradePanelboard installationService entrance and metering install
Main bonding jumper (MBJ)
The single neutral-to-ground bond at the service, where a non-separately-derived generator's neutral stays bondedIn: Generator grounding and bonding
Main drain entrapment
Suction holding a swimmer, hair, or clothing against a drain hard enough to trap or drown; the system's deadliest hazardIn: Pool and spa mechanical systems
Main tee / cross tee / wall angle
The load-carrying main runner, the cross member that forms the tile module, and the L-shaped perimeter trim and supportIn: Suspended acoustical ceiling field guide
Main vs circulation relief valve
The main relief is a large safety valve for over-pressure; the circulation relief bleeds a small flow to cool the pump at no-flowIn: Fire pump acceptance test
Mainline vs lateral
Mainline stays under constant pressure to the valves; laterals carry one zone to its heads when it runsIn: Sprinkler system design
Maintain temperature
The temperature the cable holds the pipe at, about 40°F for freeze protectionIn: Pipe freeze protection field guide
Maintenance agreement / RSA
The recurring service contract; recurring service-agreement revenue is abbreviated RSAIn: HVAC maintenance agreement guide
Maintenance bypass
Manual interlocked path to service the whole UPS with the load upIn: UPS types and technologies
Maintenance of traffic (MOT)
The phasing and work-zone plan that keeps the bridge open during the work, often by staged half-width constructionIn: Bridge deck construction
Make-ready
The service, conduit, and pads built ahead of and beyond the first chargers so expansion is a connectionIn: DC fast charging station designEVSE install and commissioningDaily huddle field guide
Make-ready / constraint
Clearing what an activity needs, such as an RFI, submittal, material, or prior trade, before it is dueIn: Project scheduling
Make-ready / planning
Confirming a task has its materials, tools, equipment, information, approvals, and access in place before the crew starts itIn: Field leadership and the foreman role
Make-up water
Fresh water the fill valve adds to hold loop pressure; every gallon brings oxygen and minerals, so a rising count signals a leakIn: Hydronic water and glycol field guideData center water use and WUE
Make-up water meter
The meter on the feed that records every gallon added, so a rising count flags a leakIn: Hydronic water and glycol field guide
Makeup
Fresh water added to replace evaporation, drift, and blowdownIn: Cooling tower types and operationCooling tower commissioning
Makeup air
Air brought in to replace what is exhausted, by ducted outside air, transfer air, or surplus supplyIn: Building pressurization field guideCommercial exhaust ventilation guide
Makeup air balance
Replacing the air the hood exhausts so the building does not go negative, with the kitchen held slightly negative to the dining roomIn: Kitchen equipment install field guide
Maltenes
The lighter, oily fractions of asphalt binder that keep it soft and ductile, lost to oxidation as the pavement agesIn: Fog seal and rejuvenator preservation
Management reserve
Money held above the estimate baseline for unknown-unknowns, the unforeseeable, usually controlled by the owner or senior management rather than the estimator.In: Contingency and risk pricing
Mandrel
A rigid slug pulled through each duct to prove it is clean, round, and clear before cableIn: Concrete-encased duct bank field guide
Manifest
The hauler's disposal receipt proving the grease reached a legal disposal siteIn: Grease interceptor field guide
Manifold
The supply and return assembly where all loops in a zone connect, carrying flow meters and actuatorsIn: Radiant floor heating design
Manifold / probes
The gauge set or wireless clamp-on probes that read suction and liquid pressure and temperatureIn: Refrigerant charging field guide
Manifold gauge set
The gauges, hoses, and valves that read refrigerant high and low pressure and connect the system to pump, recovery, and cylinderIn: HVAC test instruments field guide
Manifold pressure
The gas pressure the valve delivers to the burners, set to the data plateIn: Gas furnace field guide
Manometer
Reads pressure in inches of water column: duct static, gas manifold pressure, and draftIn: HVAC test instruments field guide
Manpower
Labor headcount on the job, recorded by company, trade, and area, ideally tied to a cost codeIn: Construction daily report guide
Manpower by area
The head count of workers in each zone, broken out by trade, rather than a single site totalIn: Daily huddle field guide
Mantrap / portal / vestibule
Interlocked doors passing one cleared person at a time to defeat tailgatingIn: Data center physical security field guide
Manual D
ACCA's residential and light-commercial duct design procedure, built on available static pressure and the friction rateIn: Manual D duct design field guide
Manufacturer warranty
The product maker's coverage of the equipment or material itself, usually longer than the workmanship warrantyIn: Closeout and warranty management
Map pack / local pack
The three-business block of local results above the regular search listings, where review volume, recency, and rating heavily influence who appearsIn: Customer communication and reviews
Margin fade
The estimated job margin eroding toward the actual as costs run over; the WIP shows it earlyIn: Construction cash flow and WIP
Margin on the stated cost basis
Selling price less the identified costs and reserve, divided by selling price; state whether overhead is included.In: First school HVAC bid checklist
Marine-grade fastener
Hardware rated for immersion, 316 stainless in salt water or hot-dip galvanized for fresh, matched to avoid galvanic attackIn: Boat dock and marina construction
Marked volume
The cubic-inch capacity stamped on a body, required before any splice, tap, or device is allowed in itIn: Conduit bodies and fittings
Marked-up set
Any field set in progress, the live working red-line before it becomes the formal as-builtIn: As-built record drawings
Market-based vs location-based
Carbon valued at contracted power versus the average emissions of the physical grid; report bothIn: Data center sustainability reporting
Markup
A percentage added to cost; a 50 percent markup is about a 33 percent marginIn: Landscape estimating and biddingOverhead recovery and bid markupConcrete estimating and takeoff
Markup vs margin
Markup is the multiplier on cost; margin is profit as a percent of price; they are different numbersIn: HVAC estimating and bidding field guideElectrical estimating and biddingAsphalt paving estimatingPlumbing estimating and takeoff guide
Masonry / CMU
Units laid in mortar; CMU is the concrete masonry unit, the concrete blockIn: Masonry construction
Mass concrete
Any placement large enough that hydration heat must be managed to control cracking, often a least dimension of about 3 to 4 ftIn: Mass concrete thermal control
Mass notification / ECS
Emergency communication system: intelligible emergency voice and visible messaging to occupants, life-safety equipment under NFPA 72In: Intercom and paging design field guide
Mass-concrete (pit) underpinning
Hand-dug pits in sequence under a footing, filled with concrete to a deeper bearing levelIn: Foundation underpinning and repair
Massing
Planting one variety in solid blocks or drifts so the color reads from a distance, rather than dotting single plantsIn: Seasonal color and annual rotation
Mast-climbing work platform (MCWP)
A powered deck that climbs a mast bolted to the building on a rack-and-pinion drive; the whole installation, the platform, mast, ties, and baseIn: Mast-climbing work platform safety
Master mixing valve
Source valve at the heater (ASSE 1017) that tempers storage down for the distribution systemIn: Mixing valves, scald, and Legionella
Master valve
A source valve the controller opens only while a zone runs, limiting how long a break can flowIn: Irrigation controller programming
Mat / raft
One large slab carrying the whole building, for heavy loads or weak soilIn: Foundation types and footings
Matched precipitation
Every head on a zone applying the same depth per hour, the condition for a fixable scheduleIn: Irrigation audit field guide
Matched precipitation rate
All heads on a zone applying the same depth per hour, so one run time waters evenlyIn: Sprinkler system design
Matched set
Belts within a tight length tolerance, replaced together on a multi-belt driveIn: Fan belt and sheave alignment guide
Material-only warranty
A material remedy for the named material failure, with labor and accessories outside that remedyIn: Roof warranty types and NDL
Materialman's lien
A supplier's claim against the property where unpaid material was furnished, governed by state lawIn: Accounts payable and supplier management
Matrix and aggregate
The matrix is the binder and background color; the aggregate is the decorative chip, marble, glass, granite, or recycled glassIn: Terrazzo flooring install and polish
Mature size
The height and spread a plant reaches at maturity, the number that should drive selection and spacingIn: Landscape design and plant selection
Maturity (ASTM C1074)
An in-place strength estimate from the concrete's temperature-and-time history against a calibrated curveIn: Cold weather concreting
Maturity index
The single number combining time and temperature, either TTF or equivalent ageIn: Concrete maturity method
MAU (makeup air unit)
The supply fan and heating section that replaces the air a kitchen hood exhaustsIn: Makeup air unit field guide
MAWP
Maximum allowable working pressure, the pressure the relief valve set point must not exceedIn: Boiler startup commissioning
Max-to-min ratio
Highest divided by lowest reading; the 2024 IBC emergency-lighting limit used here is 40:1In: Emergency and egress lighting
Maximum dry density (MDD)
The peak dry unit weight a soil reaches in the Proctor test, the 100 percent referenceIn: Pavement base and subgrade compaction
Maximum intended load
The total of workers, tools, material, and any force on the scaffold; capacity is at least 4 times thisIn: Supported scaffold safety
Maximum series run
The manufacturer's limit on strings connected end to end before the run is overloaded and the fuse blowsIn: Commercial holiday lighting install
Maximum system voltage
The highest voltage the array can reach at the coldest expected temperature, capped by the equipment ratingIn: PV system wiring (NEC 690)
MBB / BBM
Make-before-break for the maintenance bypass; break-before-make for the STS source swapIn: UPS and STS commissioning hold points
MBCx
Monitoring-based commissioning, using continuous data and analytics to keep a building commissioned over timeIn: FDD and building analytics field guide
MBH
Thousands of Btu per hour, the common hot water and small boiler output unitIn: Unit heater field guideBoiler types field guide
MBH / MMBtu/hr
Thousands and millions of BTU per hour, the units boiler input and output are rated inIn: Boiler startup commissioning
MBJ / SBJ
Main bonding jumper at service equipment and system bonding jumper at the permitted point of a separately derived systemIn: Grounding vs bonding explainedGrounding and bonding field guide
MC / AC cable
Metal-clad cable and armored cable, conductors with armor in one assemblyIn: Wiring methods and conduit types
MC4 connector
A PV connector product family; use the specified compatible components, cable and assembly toolsIn: Solar PV O&M field guide
MCA / MOCP
Minimum circuit ampacity sizes the conductors; maximum overcurrent protection caps the breaker or fuseIn: RTU install and startup field guideDisconnect switch types and requirementsSplit-system install field guide
MCCB
Molded-case circuit breaker, the general-purpose thermal-magnetic standardIn: Overcurrent protection guide
MCOV
Maximum continuous operating voltage the device tolerates without degrading; set above the system voltageIn: Surge protection (SPD) field guideSPD installation field guide
MCP
Motor circuit protector, an instantaneous-trip-only breaker used in a listed combination starterIn: Motor protection and overload relays
MDA / HDA / EDA
Main, horizontal, and equipment distribution areas, the TIA-942 spaces from the central cross-connect out to the rackIn: Data center structured cabling
MDF / IDF
Main and intermediate distribution frames, the main and floor-level telecom roomsIn: Low-voltage and Class 2 cabling
MDR
Motorized driven roller, a roller with a low-voltage motor inside that drives a zone, the basis of zoned accumulationIn: Conveyor system installation
Mean radiant temperature (MRT)
Average temperature of the surrounding surfaces, which drives comfort along with air temperatureIn: Infrared radiant heater field guide
Means of egress
The full path out: exit access, exit, and exit discharge to the public wayIn: Emergency and egress lighting
Measured mile
A loss-of-productivity method comparing the rate in an unimpacted period against an impacted period of similar work, the gap being the lossIn: Construction labor productivity tracking
Measurement and verification (M&V)
Proving actual savings by comparing normalized energy before and after a measure, per the IPMVP options A to D.In: Energy audit and management field guide
MEC / MDC
Minimum extinguishing concentration, the percentage that just puts the fire out, and minimum design concentration after the safety factorIn: Clean agent room integrity
Mechanical seal
Two lapped faces, one rotating and one fixed, sealing the shaft with a thin water film; it must not run dryIn: Hydronic pump install field guide
Mechanical splice
A coupler that joins two bars and carries the force through the device, graded by strength developedIn: Development length and lap splicesFiber splice loss budget
Mechanical splice / coupler
A device that joins two reinforcing bars end to end and transfers force bar to bar, not through concrete bondIn: Mechanical splices and couplers
Mechanical vs ventilation dehumidification
Mechanical uses a refrigeration coil to condense moisture out; ventilation brings in drier outdoor air and exhausts the moist airIn: Natatorium HVAC field guide
Mechanically attached
Racking bolted to the structure through flashed penetrations; lighter load, more holesIn: Solar-ready roof provisions
Mechanics lien
A security claim recorded against improved real property when a contractor, sub, supplier, or laborer is not paid; it can cloud title and, in most states, be foreclosed.In: Mechanics lien and preliminary noticeAR and collections field guide
Medical surveillance
Baseline and periodic exams, including chest X-ray and spirometry, offered to workers who must wear a respirator 30 or more days a yearIn: Silica exposure control program
Medium temp / low temp
Medium temp is a cooler holding product above freezing, commonly in the mid-30s°F; low temp is a freezer holding product frozen, commonly near 0°F to about -10°FIn: Commercial refrigeration field guide
Medium voltage
Distribution voltages roughly 5 to 35 kV, between low voltage and high voltage; sometimes given as 2.4 to 35 kVIn: MV termination and splicing
Meet-me room (MMR) / cross-connect
The MMR is where carriers and tenants interconnect; a cross-connect is the physical cable linking two endpoints through itIn: Colocation fit-out field guide
Megger / insulation resistance
A DC test of the cable jacket's resistance in megohms, taken before and after installIn: Pipe freeze protection field guide
Megohm
Unit of insulation resistance, one million ohms; 1 gigohm equals 1000 megohmsIn: Insulation resistance testing field guide
Megohmmeter (megger)
An insulation-resistance tester applying a high DC voltage, read in megohms, de-energized onlyIn: Electrical troubleshooting and multimeter testingBusway receiving and megger QA
Mellowing
The rest period after first mixing that lets lime react through plastic clay before final compactionIn: Subgrade stabilization
Membrane penetration
A breach in only one face of a rated assemblyIn: Pipe penetration firestop guide
MEMS
Micro-electro-mechanical systems; here, an array of tiny tilting mirrors that steer the optical beam inside an OCSIn: Optical circuit switch and photonics
MEP
Mechanical, electrical, and plumbing, the systems that carry most of a data center's cost and scheduleIn: Data center buildout phases
MEP make-safe / LOTO
Capping, disconnecting, locking out, and verifying dead the mechanical, electrical, and plumbing before cutting; LOTO is lockout-tagout of hazardous energy.In: Interior demolition strip-out
MERV
Minimum Efficiency Reporting Value, the filter's particle-capture rating; higher is finer and more restrictiveIn: HVAC preventive maintenance guideZinc whiskers and contamination controlAir handling unit (AHU) field guideAir filtration and MERV field guide
MERV-A
The MERV after Appendix J conditioning discharges electrostatic media, the in-service efficiencyIn: Air filtration and MERV field guide
Mesh
Filter fineness, openings per linear inch; 150 to 200 mesh is the common drip rangeIn: Drip irrigation design and install
Mesh-BN
Mesh bonding network in the equipment room, commonly 1/0 to the busbar and 6 AWG to each rackIn: Data center grounding and SRG
Metadata / EXIF
The data stored with an image, including timestamp, GPS location, and device, plus any tags or description added at captureIn: Field photo documentation
Metal roof restoration
Renewing an aging metal roof in place by treating rust, repairing fasteners and seams, and coating it, instead of a tear-offIn: Metal roof restoration
Metal-bond vs resin-bond diamond
Metal bonds cut and expose the slab, resin bonds polish it to gloss, with a transitional step betweenIn: Polished concrete grind and densify
Metal-clad
Medium-voltage switchgear with each compartment isolated by grounded metal barriers, per IEEE C37.20.2In: Distribution equipment guide
Metal-clad switchgear
MV switchgear with drawout breakers and fully barriered compartments for the breaker, bus, and terminationsIn: MV switchgear maintenance and testing
Meter setter / horn
The rigid bracket or yoke that holds the meter to its lay length and carries the valves, so a meter can be changed without cutting pipeIn: Water service and meter tap guide
Metered / outlet-metered
A strip that reads total current at the inlet, or current per outletIn: Data center rack PDU types
Metered vs committed billing
Metered bills the kWh you actually use; committed bills a flat charge for the reserved breaker capacityIn: Colocation fit-out field guide
Metering device
The restriction between the high-pressure liquid line and the low-pressure evaporator that drops pressure and meters liquid into the coilIn: Metering devices field guide
Method A / B / C
The three TIA-568 channel schemes: straight trunk with a flipped cord, reversed trunk, or pair-flipped trunkIn: MPO/MTP polarity methods
MEWP
Mobile elevating work platform, the ANSI A92 term covering boom, scissor, and vertical mast machinesIn: Aerial lift and MEWP safety
mg/L
Milligrams per liter, equal to parts per million in water; the unit for dose and residualIn: Potable water disinfection guide
MHz
Megahertz; the frequency the link is swept across, 500 MHz for Cat6AIn: Cat6A certification field guide
MIC
Microbiologically influenced corrosion, localized pitting driven by bacteria in residual water, a common dry-system failureIn: Dry-pipe and pre-action trip test
Micro data center
A small, self-contained unit, from a single rack to a few cabinets, with integrated cooling, power, monitoring, and securityIn: Edge and micro data center deployment
Micro fiber
Fine fiber under about 0.3 mm that controls plastic-shrinkage cracking and gets no structural creditIn: Fiber-reinforced concrete
Micro milling
Fine milling with tight tooth spacing for a smooth, finely textured surfaceIn: Asphalt milling and cold planing
Micro-surfacing
A cold mix using a polymer-modified emulsion that sets chemically, reopens to traffic in about an hour, can be placed thicker, and can fill rutsIn: Slurry seal and micro-surfacing
Microbubble air separator
A coalescing device, best placed at the hot, low-pressure heat-source outlet, that merges tiny bubbles so they rise and ventIn: Hydronic water and glycol field guide
Microbubble separator
An air separator with a coalescing medium that merges tiny microbubbles into bubbles large enough to rise and ventIn: Expansion tank and air field guide
Microburst
A traffic spike that saturates a link or overflows a buffer for well under a second, invisible to slow polling but enough to drop packetsIn: Network observability for the AI fabric
Microclimate
A small pocket where sun, wind, moisture, or temperature differs from the rest of the site, shifting the effective zoneIn: Landscape design and plant selection
Microgrid
A local power system of sources, storage, and load that can island or run grid-parallel under one controllerIn: Data center on-site generation
Micron
A unit of vacuum, microns of mercury absolute, used during evacuation; about 500 microns is a common target before chargingIn: Refrigerant leak detection field guideWater treatment field guideRefrigerant evacuation field guideHVAC test instruments field guide
Micron gauge
Electronic vacuum gauge with a thermistor sensor that reads deep vacuum in microns; the manifold gauge cannotIn: Refrigerant evacuation field guideHVAC test instruments field guide
Microns
Unit of vacuum during evacuation; acceptance requires the model-specific endpoint and timed isolated rise test.In: Refrigerant charging field guide
Micropile
A small-diameter drilled-and-grouted steel pile for high loads, limited access, or rockIn: Foundation underpinning and repair
Microtopping
A very thin polymer-rich skim, around 1/16 to 1/8 in, troweled for a decorative finishIn: Concrete overlay and resurfacing
Mil
One thousandth of an inch. Identify whether the specified coating measurement is wet or dry thickness.In: Pavement marking and stripingRoof coating mils and yieldTPO vs EPDM vs PVCBelow-grade waterproofing
Mil / DFT
A mil is 0.001 inch; dry film thickness is the cured coating thickness measured in milsIn: Epoxy resinous floor coating install
Mill and overlay
Resurfacing by milling off the worn top layer with a cold-milling machine, then paving a new lift over itIn: Asphalt mill and overlay
Mill-and-fill
Milling off the surface course and replacing it with an overlay of similar thicknessIn: Asphalt milling and cold planing
Miller Act
Federal law requiring performance and payment bonds on federal construction over a dollar threshold; states have Little Miller ActsIn: Surety bonds and bonding capacity
Min / max airflow
The throttled floor and the design ceiling the box modulates between; min carries the ventilation requirementIn: VAV box commissioning field guide
Mineral filler
Portland cement or hydrated lime added to the mix to add cohesion and react with water to drive the breakIn: Slurry seal and micro-surfacing
Minimum airflow
The throttled-down floor, set to meet ventilation without overcooling, bounded by 62.1 and 90.1In: VAV box commissioning field guide
Minimum approach distance (MAD)
The required clearance from an energized line, set by voltage; assume the line is liveIn: Aerial lift and MEWP safetyTree removal and stump grinding
Minimum bend radius
Tightest allowed bend as a multiple of cable diameter, measured to the inside of the bendIn: Cable pull planning and tension card
Minimum flow
The lowest flow the manufacturer allows through the heat exchanger; below it the water near the fire overheatsIn: Chilled water pumping field guideBoiler startup commissioning
Minimum outside air
The ventilation floor from ASHRAE 62.1, a people component plus an area component, that DCV cannot go belowIn: Economizer and DCV field guide
Minimum position
The damper opening held for ventilation when free cooling is locked outIn: Economizer fault detection field guide
Minimum primary airflow
The lowest airflow a box will deliver, set for ventilation per ASHRAE 62.1 and the reheat floorIn: VAV vs CAV air distribution
Minutes
The official record of a meeting: decisions, attendees, action items, and open items, issued and allowed to stand correctedIn: Progress meetings field guide
Miscibility
How well the oil mixes with the refrigerant; poor miscibility means the oil drops out and staysIn: Oil return field guide
Mitigation
A topical moisture barrier, often a two-component epoxy membrane under ASTM F3010In: Slab moisture testing for flooringTree risk assessment
Mitigation / restoration
Mitigation is the emergency work that stops the loss from worsening; restoration is the rebuild of what was removedIn: Water damage restoration field guide
Mitigation duty
The policy obligation, from ISO-form sue-and-labor language, to take reasonable steps to protect property from further loss after a covered eventIn: Emergency board-up and tarping
Mix design
The approved proportions of cement, water, aggregate, and admixtures to meet specified strength, durability, and workabilityIn: Mix design and water-cement ratio
Mixed bed
Cation and anion resin blended in one vessel for the highest-purity polishIn: Pure water RO/DI field guide
Mixing / injection
Blending hot source water with cooler loop return to hold the low radiant supply temperatureIn: Radiant floor heating design
Mixture
Two or more different grass species planted togetherIn: Turfgrass selection
MLO
Main lugs only; a panel with no main breaker, protected by an overcurrent device upstreamIn: Panelboard installation
MLPE
Module-level power electronics, microinverters or DC optimizers that control voltage at each moduleIn: PV rapid shutdown (NEC 690.12)PV system wiring (NEC 690)
MLV (minimum local value)
The lowest F-number allowed in any single test section, so an average cannot hide a local failureIn: Floor flatness and levelness
MMR
Meet-me room, the neutral space where carriers and tenants interconnect through cross-connects, often split into MMR-A and MMR-B for redundancyIn: Cross-connect patch records
MMR / meet-me room
The space where carriers and networks interconnect inside the buildingIn: White space and gray space field guide
Mob / demob
Mobilization and demobilization, the trip to start the job and the trip home, and the travel pay that covers themIn: Hours, overtime, and per diem proof
Mobilization
A planned trip and setup to perform the work. Include travel, loading, closure setup, and the actual crew time required.In: Asphalt paving estimatingParking-lot striping prospect listJobsite logistics field guideGeneral conditions and indirect costs
Mock-up and field water test
A full-size test wall proven for air, water, and structural load before the building, then confirmed on the installed wall by an ASTM E1105 water test.In: Curtain wall and glazing
Mod-bit
Modified bitumen, an asphalt sheet membrane reinforced with mat and modified with SBS or APP polymerIn: Modified bitumen installation
Modal dispersion
Pulse spreading from many modes arriving at different times, the limit on multimode distanceIn: Data center fiber types
Modbus
A register-based protocol common on chillers, meters, and UPS; no built-in object model, so scaling and register maps must be verifiedIn: BMS and DDC controls commissioning
Modbus / BACnet / IEC 61850
The common protocols meters and relays use to report to the EPMS serverIn: EPMS and power metering
Mode of action / RAC group
How a product kills, grouped by IRAC, FRAC, or HRAC number on the label, the basis for rotationIn: Landscape IPM field guide
Mode-field diameter (MFD)
Width of the light-carrying region in singlemode; a mismatch causes built-in splice lossIn: Fiber splice loss budget
Model + control dependency
The rule that a robot is only as accurate and correct as the coordinated model and the survey control it builds from; a bad model or control yields bad outputIn: Construction robotics
Model-to-field
Exporting coordinated points from the BIM model to the instrument so the field builds exactly to the model on the project coordinate systemIn: Construction layout
Modified bitumen
Polymer-modified asphalt low-slope sheet, applied by torch, mop, cold adhesive, or self-adheredIn: Roofing system types
Modified Proctor (ASTM D1557)
The higher-energy test, roughly 4.5 times the effort, higher MDD and lower OMCIn: Pavement base and subgrade compaction
Modular / panel vs felt / pocket
Modular uses pre-grown cassettes or trays of media on a frame; felt uses geotextile pockets fed hydroponically with no soilIn: Living wall and green wall systems
Modular / self-contained / remote
Head on a separate bin or dispenser; maker and bin in one undercounter cabinet; head inside with the condenser mounted outsideIn: Commercial ice machine field guide
Module
The repeating stall-plus-aisle-plus-stall unit, about 60 ft for double-loaded 90-degree parkingIn: Striping layout and stall geometry
Modulus of rupture (MR)
Flexural strength of the concrete, the property that governs slab thicknessIn: Slab on grade design and thickness
Mogul
An oversized conduit body with extra internal depth for the bending radius of large conductorsIn: Conduit bodies and fittings
Moisture gradient
The difference in moisture content between the drier top and the wetter bottom that drives the curlIn: Slab curling and warping control
Moisture mitigation
A topical barrier, usually an epoxy coating, applied when the slab tests over the limitIn: Commercial resilient flooring install
Moisture survey
An infrared, nuclear, or capacitance scan, verified by core cuts, that maps wet insulation before a roof is coatedIn: Roof coating restoration systemReroof: recover vs tear-offRoof leak diagnosis
Moisture test (MVER / RH)
Slab moisture measured by ASTM F1869 emission rate or ASTM F2170 in-situ relative humidity before a bonded pourIn: Terrazzo flooring install and polish
Mold remediation
Controlled removal of mold growth plus correction of the moisture source that fed itIn: Mold remediation field guide
Monitored vs recorded
Monitored is watched and responded to live; recorded is stored for review after the factIn: Jobsite camera and video monitoring
Monitoring / scouting
Walking a property on a schedule to read plants for early stress and feed the pest and disease decisionsIn: Plant health care (PHC)
Monitoring-based commissioning (MBCx)
Continuous commissioning run by analytics so the tuning never stopsIn: Retro-commissioning existing buildings
Monopole / lattice / guyed
The three tower families: a single steel tube, a bolted self-support truss, and a slender mast held by guy cablesIn: Cell tower and antenna install
Monostand
A single cultivar of a single species across a whole lawn, the fragile optionIn: Turfgrass selection
Monostrand
A single seven-wire strand, greased and sheathed, the common unbonded building tendonIn: PT slab stressing
MOP
Method of Procedure; the approved step-by-step script, with risk and rollback, for changing a critical component's stateIn: Data center PM programMetering devices field guideData center MOP SOP EOP
Mortar matching
Matching the new mortar to the original in type, lime content, color, sand, and profile, proven by a test panelIn: Masonry repointing and restoration
Mortar types M, S, N, O
ASTM C270 types by decreasing strength; match to the unit, not always the strongestIn: Masonry construction
MOT / traffic control plan
Maintenance of traffic, the plan for moving vehicles and pedestrians safely past the work in the public right-of-wayIn: Jobsite logistics field guide
Mounting height
Height of the discharge nozzle above the floor, the distance the throw has to coverIn: Air curtain field guide
Mounting hole pattern
The repeating three-holes-per-U spacing that lets any compliant device land on the same holesIn: Data center cabinet and rack types
MOV
Metal-oxide varistor, the sacrificial element in most SPDs that degrades with each surgeIn: Surge protection (SPD) field guide
Movement / expansion joint
A joint built to open, close, and shear, sealed with a centerbulb waterstopIn: Waterstop field guide
Movement class
The plus-or-minus percentage of joint width a sealant can take, per ASTM C920, such as class 25In: Joint sealant replacement
Movement joint (EJ171)
A soft, sealant-filled joint at the perimeter, in the field, over slab joints, and at changes of plane that lets the tile and building move without tenting.In: Ceramic and porcelain tile installation
Movement range
The opening and displacement envelope established from the project's applicable movement combinationsIn: Building movement joint systems
Movement rating
How far a cover can let the joint open, close, and on a seismic joint shear, before the bellows is overworkedIn: Roof expansion joint installation
MPII
Manufacturer's printed installation instructions, the install procedure ACI 318 Chapter 17 referencesIn: Adhesive anchor installationConcrete anchor installationAnchor bolt and baseplate grout QA
MPO / MTP
Multi-fiber connector carrying 8 to 24 fibers in one ferrule; MTP is a brand of MPO, the basis of parallel opticsIn: Data center structured cablingGPU network optics and cablingData center fiber typesMPO/MTP polarity methods
MR (modulus of rupture)
Flexural strength of concrete, the tensile stress in bending at which it cracks, in psiIn: Slab on grade design and thickness
MS4
Municipal separate storm sewer system, the permitted public storm networkIn: Bioretention and rain gardens
MSD
Musculoskeletal disorder, injury to muscles, nerves, tendons, joints, or discs, often from overexertion or repetitionIn: Material handling and lifting ergonomics
MSE wall
Mechanically stabilized earth: a reinforced soil mass behind a wall face, used for tall wallsIn: Retaining wall types and selection
MTR (material test report)
The mill certificate proving the pipe or component is the alloy and grade the spec requiredIn: Industrial process piping
MTTD / MTTR
Mean time to detect a fault; mean time to restore, repair, or resolve, which are different measures, so state which one you meanIn: Incident management and outage response
MTV (material transfer vehicle)
Machine between truck and paver that re-blends gradation and temperature before the paverIn: Asphalt segregation
mu
Coefficient of friction between the cable jacket and the conduit, roughly 0.5 dry and 0.2 lubricatedIn: Cable pull planning and tension card
Mud sill
A plank or pad under the base plate that spreads the leg load across soft or uneven groundIn: Supported scaffold safety
Mulch volcano
Mulch piled in a cone against the trunk; rots the bark and invites girdling rootsIn: Mulch beds and weed control
Multi-tap
A transformer with several voltage output terminals (12, 13, 14, 15 V) used to offset voltage drop on long runsIn: Low-voltage landscape lighting
Multi-tap transformer
A transformer with 12, 13, 14, 15 V output terminals used to offset voltage drop on long runsIn: Low-voltage landscape lighting
Multimeter
Reads voltage, resistance, continuity, and capacitance; the core electrical diagnosis instrumentIn: HVAC test instruments field guide
Multimode (MM)
Fiber with a ~50 micron core carrying many modes, shorter reach from modal dispersion, VCSEL source, graded OM1 to OM5In: Data center fiber types
Multiplier
The factor by angle that turns offset depth into the distance between the two bendsIn: Conduit bending fundamentals
MUTCD
Manual on Uniform Traffic Control Devices, the FHWA reference for marking colors, widths, and retroreflectivityIn: Striping layout and stall geometryPavement marking materials and application
Mutual heating
The temperature rise each loaded conductor causes in its neighbors, which lowers the ampacity of every conductor in the bankIn: Concrete-encased duct bank field guide
MV / HV
Medium voltage, roughly 1 to 35 kV, and high voltage, the transmission levels above itIn: Data center grid and substation
MV / LV
Voltage classifications used by the applicable standard; record actual equipment voltages and ratingsIn: Data center power distribution chain
MVER
Moisture vapor emission rate, pounds per 1000 square feet per 24 hours, from the ASTM F1869 calcium chloride testIn: Slab moisture testing for flooringUnder-slab vapor barrier and slab moistureConcrete overlay and resurfacing
MVER (ASTM F1869)
Moisture vapor emission rate, pounds per 1000 sq ft per 24 hr by calcium chlorideIn: Commercial resilient flooring installSelf-leveling underlayment floor prepEpoxy resinous floor coating install
MVER / RH
Moisture vapor emission rate (ASTM F1869, lb/1000 sf/24 hr) and internal relative humidity (ASTM F2170, percent), the moisture tests before a coatingIn: Concrete sealers and coatings
MVR
Motor-vehicle record, the state DMV driving history showing license status, violations, convictions, suspensions, and crashesIn: Fleet and driver safety program
MW / GW
Megawatt and gigawatt, the scale of a data center campus loadIn: Data center grid and substation
MW capacity
Megawatts of electrical load a site can be delivered and the building can use, the headline number of a campusIn: Data center site selection
MWBC
Multi-wire branch circuit: two opposite-phase hots sharing one neutral, with a simultaneous disconnectIn: Multiwire branch circuitsFeeder and branch circuit sizingDevice wiring: receptacles and switchesPanelboard installation
Myers hub / raintight hub
A listed sealing conduit fitting that holds the watertight rating at an entryIn: NEMA enclosure ratings

All glossary terms

On the job

Crews log these terms against real jobs in FieldOS, then hand the customer a clean proof page. See how FieldOS works.