A polarized potential of -850 mV or more negative versus a copper/copper-sulfate electrode, the standard proof of protection in soilIn: Cathodic protection field guide
0-10V
Analog dimming over a low-voltage control pair, 10 V full to about 1 percent floor, polarity-sensitiveIn: Lighting controls and dimming
0-10V dimming
Low-voltage control pair that tells the LED driver how to dim, separate from the line voltageIn: LED lighting retrofit
0U / vertical
A PDU mounted outside the equipment rack-unit positions, with physical clearance still requiredIn: Data center rack PDU types
Capacity factor in the cited Fire-Lite calculation method; apply all other equipment-specific requirementsIn: Fire alarm install and test
1/0 AWG
The minimum conductor size the NEC permits to be paralleled for power, with narrow exceptionsIn: Parallel conductors, NEC
100 percent tie-off
Staying connected to an anchor at all times at height, including during transitions, the core of fall protectionIn: Cell tower and antenna install
11-month inspection
A full warranty walk before the one-year warranty expires, to catch defects while the contractor still owes the fixIn: Closeout and warranty management
3-pole switches the phases and leaves the neutral solid (not SDS); 4-pole switches the neutral too (SDS). The single-phase equivalent is 2-pole versus 3-poleIn: Generator grounding and bonding
32 reverse power
ANSI device 32, which trips a set that is motoring, drawing power from the bus instead of supplying itIn: Generator paralleling switchgear
4 to 1 ratio
Extension ladder base set out 1 ft for every 4 ft of working height, about a 75 degree angleIn: Portable ladder safety
4-bolt rule
1926.755 requirement that each column be anchored by a minimum of four anchor rods (anchor bolts), with a 300 lb eccentric-load strength criterionIn: Steel erection and connections
An estimating conversion: divide painted square feet by one-third of a foot. Keep the original widths and item counts in the scope.In: Parking-lot striping prospect list
40 CFR 280
The federal EPA technical standards for underground storage tanks, adopted and enforced through state UST programsIn: Fuel storage tank field guide
OIF-defined coherent pluggables for amplified single-span DWDM, targeting roughly 80 to 120 km metro DCI; ZR+ variants extend the reachIn: Data center interconnect (DCI)
450.3
The NEC transformer overcurrent rule, sized off the transformer current, not the conductorIn: Dry-type transformer guide
4D / 5D
4D ties the model to the construction schedule for sequencing; 5D ties it to quantities and costIn: BIM VDC coordination
4PPoE
Four-pair PoE, the 802.3bt method that uses all four pairs for Type 3 and Type 4 powerIn: PoE voltage drop and heat
4X / corrosion-resistant
Type 4 plus a corrosion-rated material such as stainless, fiberglass, or polycarbonateIn: NEMA enclosure ratings
5 lb electrode (2.27 kg)
The defined-weight cylindrical probe STM7.1 uses; its contact pressure is part of the methodIn: ESD floor testing field guide
Constant-voltage speaker distribution where transformer taps set each speaker's power, used for many speakers over long runsIn: Intercom and paging design field guide
8 in flashing height
The commonly cited NRCA minimum height base flashing turns up above the finished roof, higher in heavy snowIn: Roof penetration flashing
8.33
BTU to raise one gallon of water 1 degree F, since a gallon weighs 8.33 lb at a specific heat of 1.0In: Water heater sizing and selection